Railway Engineering The side slope of embankments for a railway track is generally taken as 1.5:1 1:1 1:2 2:1 1.5:1 1:1 1:2 2:1 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following methods of designation of crossing is mostly used in India ? right angle method None of these center line method isosceles angle method right angle method None of these center line method isosceles angle method ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a Broad Gauge route with M+7 sleeper density, number of sleepers per rail length is 18 19 20 21 18 19 20 21 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following types of sleepers is preferred on joints ? concrete sleeper wooden sleeper steel trough sleeper CST-9 sleeper concrete sleeper wooden sleeper steel trough sleeper CST-9 sleeper ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a railway track depends on the i) type of gauge ii) number of tracks to be laid side by side iii) slope of sides of embankment or cutting The correct answer is (i), (ii) and (iii) only (i) both (i) and (ii) both (i) and (iii) (i), (ii) and (iii) only (i) both (i) and (ii) both (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP