Railway Engineering The side slope of embankments for a railway track is generally taken as 1:1 1:2 2:1 1.5:1 1:1 1:2 2:1 1.5:1 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following turnouts is most commonly used for goods train on Indian Railways ? 1 in 16 1 in 12 1 in 20 1 in 8’/2 1 in 16 1 in 12 1 in 20 1 in 8’/2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Switch angle depends on i) heel divergence ii) length of tongue rail iii) flangeway clearance iv) throw of switch The correct answer is (ii) and (iii) (iii) and (iv) (i)and(iv) (i) and (ii) (ii) and (iii) (iii) and (iv) (i)and(iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Study the following statements regarding creep.i) Creep is greater on curves than on tangent railway track,ii) Creep in new rails is more than that in old rails,iii) Creep is more on steep gradients than on level track.The correct answer is (i), (ii) and (iii) (i)and(ii) only (i) (ii) and (iii) (i), (ii) and (iii) (i)and(ii) only (i) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements about concrete sleepers.1. They improve the track modulus.2. They have good scrap value.3. They render transportation easy.4. They maintain the gauge quite satisfactorily of these statements 3 and 4 are correct 1 and 2 are correct 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct 1 and 2 are correct 2 and 3 are correct 1 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP