Railway Engineering Switch angle is the angle between the gauge face of the stock rail and tongue rail the outer face of the stock rail and tongue rail the outer face of the stock rail and the gauge face of the tongue rail the gauge face of the stock rail and outer face of the tongue rail the gauge face of the stock rail and tongue rail the outer face of the stock rail and tongue rail the outer face of the stock rail and the gauge face of the tongue rail the gauge face of the stock rail and outer face of the tongue rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,2,4 3,1,2,4 3,1,4,2 1,3,4,2 1,3,2,4 3,1,2,4 3,1,4,2 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Lead of crossing is the distance from the heel of the switch to the toe of the switch toe of the switch to the theoretical nose of crossing toe of the switch to the actual nose of crossing heel of the switch to the theoretical nose of the crossing heel of the switch to the toe of the switch toe of the switch to the theoretical nose of crossing toe of the switch to the actual nose of crossing heel of the switch to the theoretical nose of the crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Metal sleepers are superior to wooden sleepers with respect to fastening life track circuiting cost fastening life track circuiting cost ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering If a is the angle of crossing, then the number of crossings āNā according to right angle method is given by Vi cosec(a/2) cot(a) Vi cot(cc/2) cot(oc/2) Vi cosec(a/2) cot(a) Vi cot(cc/2) cot(oc/2) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of switches provided on a Gaunt-letted track is None of these 2 1 3 None of these 2 1 3 ANSWER DOWNLOAD EXAMIANS APP