Railway Engineering Ordinary rails are made of cast iron wrought iron mild steel high carbon steel cast iron wrought iron mild steel high carbon steel ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For the purpose of track maintenance, the number of turn out equivalent to one track km are 2 10 1 5 2 10 1 5 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Cant deficiency occurs when a vehicle travels around a curve at Equilibrium speed Booked speed Speeds higher than equilibrium speed Speeds lower than equilibrium speed Equilibrium speed Booked speed Speeds higher than equilibrium speed Speeds lower than equilibrium speed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 7.768 cm -0.168 cm 7.432 cm 0.168 cm 7.768 cm -0.168 cm 7.432 cm 0.168 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the center of arm of a semaphore signal above the ground is 5.5m 8.5m 6.5 m 7.5 m 5.5m 8.5m 6.5 m 7.5 m ANSWER DOWNLOAD EXAMIANS APP