Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates stop proceed None of these proceed cautiously stop proceed None of these proceed cautiously ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering To ensure exact gauge, the gauge tie plates are provided at nose of crossing toe of the switch None of these both (A) and (B) nose of crossing toe of the switch None of these both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The rail is designated by its length weight weight per unit length cross-section length weight weight per unit length cross-section ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering One degree of curve is equivalent to (where R is the radius of curve in meters.) 1750/R 1600/R 1850/R 1700/R 1750/R 1600/R 1850/R 1700/R ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Cant deficiency occurs when a vehicle travels around a curve at Equilibrium speed Speeds higher than equilibrium speed Speeds lower than equilibrium speed Booked speed Equilibrium speed Speeds higher than equilibrium speed Speeds lower than equilibrium speed Booked speed ANSWER DOWNLOAD EXAMIANS APP