Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates proceed None of these stop proceed cautiously proceed None of these stop proceed cautiously ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are (i) and (iii) (ii) and (iii) only (i) (i)and(ii) (i) and (iii) (ii) and (iii) only (i) (i)and(ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of cotters used in CST-9 sleepers is 4 2 3 5 4 2 3 5 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a B.G. railway track, the specified ruling gradent is 1 in 250. The horizontal curve of 3° on a gradient of 1 in 250 will have the permissible gradient of 1 in 257 1 in 457 1 in 357 1 in 512 1 in 257 1 in 457 1 in 357 1 in 512 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A triangle is used for Separating all the sidings and shunting lines from main lines Transferring wagons to and from parallel tracks without shunting Changing the direction of engine Preventing the vehicles from running off the track Separating all the sidings and shunting lines from main lines Transferring wagons to and from parallel tracks without shunting Changing the direction of engine Preventing the vehicles from running off the track ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements about concrete sleepers. 1. They improve the track modulus. 2. They have good scrap value. 3. They render transportation easy. 4. They maintain the gauge quite satisfactorily. Of these statements 1 and 2 are correct 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct 1 and 2 are correct 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP