Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates proceed cautiously None of these proceed stop proceed cautiously None of these proceed stop ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of switches provided on a Gaunt-letted track is 1 None of these 2 3 1 None of these 2 3 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal None of these both arms are horizontal both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal None of these both arms are horizontal ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a B.G. railway track, the specified ruling gradent is 1 in 250. The horizontal curve of 3° on a gradient of 1 in 250 will have the permissible gradient of 1 in 512 1 in 257 1 in 357 1 in 457 1 in 512 1 in 257 1 in 357 1 in 457 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number offish bolts per fish plate is 5 4 2 6 5 4 2 6 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The standard length of rail for Broad Gauge and Meter Gauge are respectively 12 m and 13 m 13 m and 13 m 13 m and 12 m 12 m and 12 m 12 m and 13 m 13 m and 13 m 13 m and 12 m 12 m and 12 m ANSWER DOWNLOAD EXAMIANS APP