Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates None of these stop proceed proceed cautiously None of these stop proceed proceed cautiously ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 20 mm/sec 55 mm/sec 65 mm/sec 35 mm/sec 20 mm/sec 55 mm/sec 65 mm/sec 35 mm/sec ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a double line Broad Gauge track in cutting (excluding drains) as adopted on Indian Railways is 8.84 m 6.10 m 10.21m 10.82 m 8.84 m 6.10 m 10.21m 10.82 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following factors govern the choice of the gauge ?i) volume and nature of trafficii) speed of trainiii) physical features of the countryThe correct answer is only (i) (i), (ii) and (iii) both (ii) and (iii) both (i) and (ii) only (i) (i), (ii) and (iii) both (ii) and (iii) both (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Flange-way clearance is the distance Between the gauge faces of the stock rail and the tongue rail Between the adjoining faces of the running rail and the check rail near the crossing Through which the tongue rail moves laterally at the toe of the switch None of these Between the gauge faces of the stock rail and the tongue rail Between the adjoining faces of the running rail and the check rail near the crossing Through which the tongue rail moves laterally at the toe of the switch None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of keys used in CST-9 sleeper is None of these 4 3 2 None of these 4 3 2 ANSWER DOWNLOAD EXAMIANS APP