Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates proceed stop proceed cautiously None of these proceed stop proceed cautiously None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A triangle is used for Transferring wagons to and from parallel tracks without shunting Changing the direction of engine Preventing the vehicles from running off the track Separating all the sidings and shunting lines from main lines Transferring wagons to and from parallel tracks without shunting Changing the direction of engine Preventing the vehicles from running off the track Separating all the sidings and shunting lines from main lines ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following mechanical devices is used to ensure that route cannot be changed while the train is on the point even after putting back the signal ? iock bar detectors stretcher bar point lock iock bar detectors stretcher bar point lock ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The total gap on both sides between the inside edges of wheel flanges and gauge faces of the rail is kept as 19 mm 10 mm 16 mm 13 mm 19 mm 10 mm 16 mm 13 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Will be more in the direction of A to B Will be maximum at the middle of A and B Will be more in the direction of B to A Cannot be determined from the given data Will be more in the direction of A to B Will be maximum at the middle of A and B Will be more in the direction of B to A Cannot be determined from the given data ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The cross-sectional area of 52 kg flat footed rail is 6155 mm² 7235 mm² 6615 mm² 7825 mm² 6155 mm² 7235 mm² 6615 mm² 7825 mm² ANSWER DOWNLOAD EXAMIANS APP