Railway Engineering Staggered joints are generally provided On curves When two different rail sections are required to be joined On straight track None of these On curves When two different rail sections are required to be joined On straight track None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The main function of a fish plate is None of these To join the two rails together To allow rail to expand and contract freely To join rails with the sleeper None of these To join the two rails together To allow rail to expand and contract freely To join rails with the sleeper ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Creep is the Difference in level of two rails Lateral movement of rail Vertical movement of rail Longitudinal movement of rail Difference in level of two rails Lateral movement of rail Vertical movement of rail Longitudinal movement of rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of cotters used in CST-9 sleepers is 5 4 3 2 5 4 3 2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 2-8-2 locomotive with 22.5 tonnes and on each driving axle. Assuming the coefficient of rail-wheel friction to be 0.25, what would be the hauling capacity of the locomotive? 45.0 tonnes 90.0 tonnes 22.5 tonnes 15.0 tonnes 45.0 tonnes 90.0 tonnes 22.5 tonnes 15.0 tonnes ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The width of foot for 90 R rail section is 136.5 mm 100 mm 146.0 mm 122.2 mm 136.5 mm 100 mm 146.0 mm 122.2 mm ANSWER DOWNLOAD EXAMIANS APP