Railway Engineering Staggered joints are generally provided None of these When two different rail sections are required to be joined On curves On straight track None of these When two different rail sections are required to be joined On curves On straight track ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,2,4 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 1,3,4,2 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The object of providing a point lock is to ensure that the point may not be operated while the train is on it None of these to detect any obstruction between and tongue rail to ensure that each switch is correctly set to ensure that the point may not be operated while the train is on it None of these to detect any obstruction between and tongue rail to ensure that each switch is correctly set ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering If ‘A’ is the angle formed by two gauge faces, the crossing number will be Arad sec A cot A tan A Arad sec A cot A tan A ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Largest percentage of material in the rail is in its foot web head head and foot both foot web head head and foot both ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The total gap on both sides between the inside edges of wheel flanges and gauge faces of the rail is kept as 10 mm 13 mm 19 mm 16 mm 10 mm 13 mm 19 mm 16 mm ANSWER DOWNLOAD EXAMIANS APP