Railway Engineering Pandrol clips cannot be used with CST-9 sleepers steel trough sleepers concrete sleepers wooden sleepers CST-9 sleepers steel trough sleepers concrete sleepers wooden sleepers ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a railway track depends on thei) type of gaugeii) number of tracks to be laid side by sideiii) slope of sides of embankment or cuttingThe correct answer is only (i) both (i) and (ii) (i), (ii) and (iii) both (i) and (iii) only (i) both (i) and (ii) (i), (ii) and (iii) both (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Will be maximum at the middle of A and B Will be more in the direction of B to A Will be more in the direction of A to B Cannot be determined from the given data Will be maximum at the middle of A and B Will be more in the direction of B to A Will be more in the direction of A to B Cannot be determined from the given data ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of keys used in CST-9 sleeper is 3 4 2 None of these 3 4 2 None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Stretcher bar is provided To prevent any vertical movement between the wing rail and nose of crossing To ensure exact gauge at the toe of the switch as well as the nose of crossing To maintain the two tongue rails at the exact distance To permit lateral movement of the tongue rail To prevent any vertical movement between the wing rail and nose of crossing To ensure exact gauge at the toe of the switch as well as the nose of crossing To maintain the two tongue rails at the exact distance To permit lateral movement of the tongue rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP