Railway Engineering Metal sleepers are superior to wooden sleepers with respect to fastening track circuiting life cost fastening track circuiting life cost ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when None of these both semaphore and warner arms lowered both arms are horizontal semaphore arm lowered but warner arm horizontal None of these both semaphore and warner arms lowered both arms are horizontal semaphore arm lowered but warner arm horizontal ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The compensation for curvature on gradient for Meter Gauge is given by (where R is radius of curve.) 70/R 52.5/R 35/R 105/R 70/R 52.5/R 35/R 105/R ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 20 mm/sec 65 mm/sec 55 mm/sec 35 mm/sec 20 mm/sec 65 mm/sec 55 mm/sec 35 mm/sec ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 2 and 3 are correct I and 2 are correct 3 and 4 are correct 1 and 4 are correct 2 and 3 are correct I and 2 are correct 3 and 4 are correct 1 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following factors govern the choice of the gauge ? i) volume and nature of traffic ii) speed of train iii) physical features of the country The correct answer is both (i) and (ii) (i), (ii) and (iii) both (ii) and (iii) only (i) both (i) and (ii) (i), (ii) and (iii) both (ii) and (iii) only (i) ANSWER DOWNLOAD EXAMIANS APP