Railway Engineering When the rail ends rest on a joint sleeper, the joint is termed as base joint suspended rail joint supported rail joint bridge joint base joint suspended rail joint supported rail joint bridge joint ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The cross-sectional area of 52 kg flat footed rail is 7825 mm² 6155 mm² 7235 mm² 6615 mm² 7825 mm² 6155 mm² 7235 mm² 6615 mm² ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Minimum depth of ballast cushion for a Broad Gauge wooden sleeper of size 275x25x13 cm with 75cm sleeper spacing is 25 cm 15 cm 48 cm 30 cm 25 cm 15 cm 48 cm 30 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 8 12 16 4 8 12 16 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Switch angle depends oni) heel divergenceii) length of tongue railiii) flangeway clearanceiv) throw of switch The correct answer is (i) and (ii) (ii) and (iii) (i)and(iv) (iii) and (iv) (i) and (ii) (ii) and (iii) (i)and(iv) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP