Railway Engineering When the rail ends rest on a joint sleeper, the joint is termed as base joint supported rail joint suspended rail joint bridge joint base joint supported rail joint suspended rail joint bridge joint ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 12 16 8 4 12 16 8 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Flange-way clearance is the distance None of these Between the gauge faces of the stock rail and the tongue rail Between the adjoining faces of the running rail and the check rail near the crossing Through which the tongue rail moves laterally at the toe of the switch None of these Between the gauge faces of the stock rail and the tongue rail Between the adjoining faces of the running rail and the check rail near the crossing Through which the tongue rail moves laterally at the toe of the switch ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) -0.168 cm 0.168 cm 7.768 cm 7.432 cm -0.168 cm 0.168 cm 7.768 cm 7.432 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a sleeper density of (n+5), the number of sleepers required for constructing a broad gauge railway track of length 650 m is 963 900 985 975 963 900 985 975 ANSWER DOWNLOAD EXAMIANS APP