Railway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when None of these semaphore arm lowered but warner arm horizontal both semaphore and warner arms lowered both arms are horizontal None of these semaphore arm lowered but warner arm horizontal both semaphore and warner arms lowered both arms are horizontal ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which one of the following rail failures is caused by loose fish bolts at expansion joints? split head crushed head angular break transverse fissures split head crushed head angular break transverse fissures ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 1 and 4 are correct 2 and 3 are correct I and 2 are correct 3 and 4 are correct 1 and 4 are correct 2 and 3 are correct I and 2 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Fish plate is in contact with rail at fishing plane foot of rail head of rail web of rail fishing plane foot of rail head of rail web of rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The distance through which the tongue rail moves laterally at the toe of the switch for movement of trains is called heel divergence throw of the switch None of these flangeway clearance heel divergence throw of the switch None of these flangeway clearance ANSWER DOWNLOAD EXAMIANS APP