Railway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when None of these semaphore arm lowered but warner arm horizontal both arms are horizontal both semaphore and warner arms lowered None of these semaphore arm lowered but warner arm horizontal both arms are horizontal both semaphore and warner arms lowered ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i)and(iv) (ii) and (iii) (iii) and (iv) (i) and (ii) (i)and(iv) (ii) and (iii) (iii) and (iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally maximum cant permissible in Meter Gauge is 75 mm 140 mm 90 mm 165 mm 75 mm 140 mm 90 mm 165 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The treadle bar is provided in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of both the rails near and parallel to inner side of one of the rails at right angle to the rail in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of both the rails near and parallel to inner side of one of the rails at right angle to the rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements I and 2 are correct 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct I and 2 are correct 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Switch angle depends on i) heel divergence ii) length of tongue rail iii) flangeway clearance iv) throw of switch The correct answer is (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP