Railway Engineering The formation width for a single line meter gauge track in embankment as adopted on Indian Railways is 4.55 mm 4.27 mm 4.88 mm 5.49 mm 4.55 mm 4.27 mm 4.88 mm 5.49 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The type of spike used for fixing chairs of bull headed rails to wooden sleepers is Dog spike Elastic spike Round spike Rail screw Dog spike Elastic spike Round spike Rail screw ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 1,3,2,4 3,1,2,4 3,1,4,2 1,3,4,2 1,3,2,4 3,1,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The correct relation between curve lead (CL), switch lead (SL) and lead of cros¬sing (L) is given by L = (CL+SL)/2 L =CL-SL CL = L – SL SL = L + CL L = (CL+SL)/2 L =CL-SL CL = L – SL SL = L + CL ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Study the following statements regarding creep. i) Creep is greater on curves than on tangent railway track, ii) Creep in new rails is more than that in old rails, iii) Creep is more on steep gradients than on level track. The correct answer is only (i) (i), (ii) and (iii) (ii) and (iii) (i)and(ii) only (i) (i), (ii) and (iii) (ii) and (iii) (i)and(ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are (ii) and (iii) (i) and (iii) (i)and(ii) only (i) (ii) and (iii) (i) and (iii) (i)and(ii) only (i) ANSWER DOWNLOAD EXAMIANS APP