Railway Engineering For a sleeper density of (n+5), the number of sleepers required for constructing a broad gauge railway track of length 650 m is 963 985 900 975 963 985 900 975 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the center of arm of a semaphore signal above the ground is 8.5m 6.5 m 5.5m 7.5 m 8.5m 6.5 m 5.5m 7.5 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Staggered joints are generally provided None of these On straight track When two different rail sections are required to be joined On curves None of these On straight track When two different rail sections are required to be joined On curves ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of cotters used in CST-9 sleepers is 3 5 4 2 3 5 4 2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are (i) and (iii) only (i) (ii) and (iii) (i)and(ii) (i) and (iii) only (i) (ii) and (iii) (i)and(ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following methods of designation of crossing is mostly used in India ? center line method isosceles angle method None of these right angle method center line method isosceles angle method None of these right angle method ANSWER DOWNLOAD EXAMIANS APP