Railway Engineering The object of providing a point lock is to ensure that the point may not be operated while the train is on it to detect any obstruction between and tongue rail to ensure that each switch is correctly set None of these to ensure that the point may not be operated while the train is on it to detect any obstruction between and tongue rail to ensure that each switch is correctly set None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number offish bolts per fish plate is 2 4 5 6 2 4 5 6 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Composite sleeper index is the index of Strength and toughness Toughness and wear resistance Wear resistance and hardness Hardness and strength Strength and toughness Toughness and wear resistance Wear resistance and hardness Hardness and strength ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For the purpose of track maintenance, the number of turn out equivalent to one track km are 1 10 2 5 1 10 2 5 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following factors govern the choice of the gauge ?i) volume and nature of trafficii) speed of trainiii) physical features of the countryThe correct answer is both (ii) and (iii) only (i) both (i) and (ii) (i), (ii) and (iii) both (ii) and (iii) only (i) both (i) and (ii) (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP