Railway Engineering The object of providing a point lock is to ensure that each switch is correctly set None of these to ensure that the point may not be operated while the train is on it to detect any obstruction between and tongue rail to ensure that each switch is correctly set None of these to ensure that the point may not be operated while the train is on it to detect any obstruction between and tongue rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Pandrol clips cannot be used with CST-9 sleepers wooden sleepers steel trough sleepers concrete sleepers CST-9 sleepers wooden sleepers steel trough sleepers concrete sleepers ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 1 and 4 are correct 3 and 4 are correct 2 and 3 are correct I and 2 are correct 1 and 4 are correct 3 and 4 are correct 2 and 3 are correct I and 2 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Largest percentage of material in the rail is in its foot head and foot both web head foot head and foot both web head ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering 52 kg rails are mostly used in Narrow Gauge Broad Gauge Meter Gauge both (a) and (b) Narrow Gauge Broad Gauge Meter Gauge both (a) and (b) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the center of arm of a semaphore signal above the ground is 8.5m 6.5 m 7.5 m 5.5m 8.5m 6.5 m 7.5 m 5.5m ANSWER DOWNLOAD EXAMIANS APP