Railway Engineering The object of providing a point lock is to ensure that the point may not be operated while the train is on it None of these to ensure that each switch is correctly set to detect any obstruction between and tongue rail to ensure that the point may not be operated while the train is on it None of these to ensure that each switch is correctly set to detect any obstruction between and tongue rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 7.432 cm 7.768 cm 0.168 cm -0.168 cm 7.432 cm 7.768 cm 0.168 cm -0.168 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The standard length of rail for Broad Gauge and Meter Gauge are respectively 13 m and 12 m 12 m and 13 m 13 m and 13 m 12 m and 12 m 13 m and 12 m 12 m and 13 m 13 m and 13 m 12 m and 12 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the rail for 52 kg rail section is 189 mm 162 mm 156 mm 187 mm 189 mm 162 mm 156 mm 187 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Maximum value of ‘throw of switch’ for Broad Gauge track is 100 mm 95 mm 115 mm 89 mm 100 mm 95 mm 115 mm 89 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering What will be the curve lead for a 1 in 8.5 turnout taking off from a straight broad gauge track? 21.04 m 7.45 m 14.24 m 28.49 m 21.04 m 7.45 m 14.24 m 28.49 m ANSWER DOWNLOAD EXAMIANS APP