Railway Engineering Number of switches provided on a Gaunt-letted track is 3 2 1 None of these 3 2 1 None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are (i)and(ii) (i) and (iii) only (i) (ii) and (iii) (i)and(ii) (i) and (iii) only (i) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally the limiting value of cant is (where G is the gauge.) G/15 G/10 G/8 G/12 G/15 G/10 G/8 G/12 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The sleepers resting directly on girder are fastened to the top flange of girder by dog spikes hook bolts rail screws fang bolts dog spikes hook bolts rail screws fang bolts ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The shape of transition curve used by Indian Railways is lemniscate of Bernoulli sine curve spiral cubic parabola lemniscate of Bernoulli sine curve spiral cubic parabola ANSWER DOWNLOAD EXAMIANS APP