• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Railway Engineering

Railway Engineering
Number of switches provided on a Gaunt-letted track is

3
2
1
None of these

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are

(i)and(ii)
(i) and (iii)
only (i)
(ii) and (iii)

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is

1,3,4,2
3,1,2,4
1,3,2,4
3,1,4,2

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
Normally the limiting value of cant is (where G is the gauge.)

G/15
G/10
G/8
G/12

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
The sleepers resting directly on girder are fastened to the top flange of girder by

dog spikes
hook bolts
rail screws
fang bolts

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
The shape of transition curve used by Indian Railways is

lemniscate of Bernoulli
sine curve
spiral
cubic parabola

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Railway Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑