• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Railway Engineering

Railway Engineering
Loose jaws of steel trough sleepers are made of

spring steel
mild steel
cast iron
cast steel

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
Minimum composite sleeper index pres-cried on Indian Railways for a track sleeper is

1588
1353
783
552

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
Consider the following statements about concrete sleepers.
1. They improve the track modulus.
2. They have good scrap value.
3. They render transportation easy.
4. They maintain the gauge quite satisfactorily of these statements

1 and 2 are correct
2 and 3 are correct
3 and 4 are correct
1 and 4 are correct

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
In a shunting signal if the red band is inclined at 45° it indicates

stop
proceed
proceed cautiously
None of these

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ?

scotch block
traverser
triangle
turntable

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
Anti creep bearing plates are provided on

both (A) and (B)
None of these
bridges and approaches
joints

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Railway Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑