Railway Engineering Due to battering action of wheels over the end of the rails, the rails get bent down and are deflected at ends. These rails are called Roaring rails Hogged rails Corrugated rails Buckled rails Roaring rails Hogged rails Corrugated rails Buckled rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (i)and(iv) (iii) and (iv) (i) and (ii) (ii) and (iii) (i)and(iv) (iii) and (iv) (i) and (ii) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering To ensure exact gauge, the gauge tie plates are provided at toe of the switch nose of crossing None of these both (A) and (B) toe of the switch nose of crossing None of these both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering 60 R rails are mostly used in Metre Gauge Broad Gauge None of these Narrow Gauge Metre Gauge Broad Gauge None of these Narrow Gauge ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 35 mm/sec 20 mm/sec 55 mm/sec 65 mm/sec 35 mm/sec 20 mm/sec 55 mm/sec 65 mm/sec ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i)and(iv) (i) and (ii) (ii) and (iii) (iii) and (iv) (i)and(iv) (i) and (ii) (ii) and (iii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP