Railway Engineering Creep is the Lateral movement of rail Difference in level of two rails Longitudinal movement of rail Vertical movement of rail Lateral movement of rail Difference in level of two rails Longitudinal movement of rail Vertical movement of rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The object of providing a point lock is to detect any obstruction between and tongue rail to ensure that the point may not be operated while the train is on it None of these to ensure that each switch is correctly set to detect any obstruction between and tongue rail to ensure that the point may not be operated while the train is on it None of these to ensure that each switch is correctly set ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of switches provided on a Gaunt-letted track is 1 2 3 None of these 1 2 3 None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements 3 and 4 are correct 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct I and 2 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a double line Broad Gauge track in cutting (excluding drains) as adopted on Indian Railways is 8.84 m 6.10 m 10.82 m 10.21m 8.84 m 6.10 m 10.82 m 10.21m ANSWER DOWNLOAD EXAMIANS APP