Railway Engineering Creep is the Lateral movement of rail Difference in level of two rails Vertical movement of rail Longitudinal movement of rail Lateral movement of rail Difference in level of two rails Vertical movement of rail Longitudinal movement of rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The maximum degree of curvature for Meter Gauge is limited to 30° 10° 16° 40° 30° 10° 16° 40° ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates proceed cautiously proceed None of these stop proceed cautiously proceed None of these stop ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The treadle bar is provided in the middle of the track a little in front of the toes of the tongue rail at right angle to the rail near and parallel to inner side of both the rails near and parallel to inner side of one of the rails in the middle of the track a little in front of the toes of the tongue rail at right angle to the rail near and parallel to inner side of both the rails near and parallel to inner side of one of the rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Study the following statements regarding creep.i) Creep is greater on curves than on tangent railway track,ii) Creep in new rails is more than that in old rails,iii) Creep is more on steep gradients than on level track.The correct answer is (i)and(ii) only (i) (ii) and (iii) (i), (ii) and (iii) (i)and(ii) only (i) (ii) and (iii) (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 1,3,2,4 3,1,2,4 3,1,4,2 1,3,4,2 1,3,2,4 3,1,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP