Railway Engineering In a scissors cross-over, the crossings provided are i) 2 obtuse angle crossings ii) 4 obtuse angle crossings iii) 4 acute angle crossings iv) 6 acute angle crossings The correct answer is (i) and (iii) (ii) and (iii) (i)and(iv) (ii) and (iv) (i) and (iii) (ii) and (iii) (i)and(iv) (ii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering What will be the curve lead for a 1 in 8.5 turnout taking off from a straight broad gauge track? 7.45 m 21.04 m 14.24 m 28.49 m 7.45 m 21.04 m 14.24 m 28.49 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Switch angle depends on i) heel divergence ii) length of tongue rail iii) flangeway clearance iv) throw of switch The correct answer is (i) and (ii) (i)and(iv) (ii) and (iii) (iii) and (iv) (i) and (ii) (i)and(iv) (ii) and (iii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Gauge is the distance between center to center of rails None of these running faces of rails outer faces of rails center to center of rails None of these running faces of rails outer faces of rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The treadle bar is provided in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of one of the rails at right angle to the rail near and parallel to inner side of both the rails in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of one of the rails at right angle to the rail near and parallel to inner side of both the rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP