Railway Engineering In a scissors cross-over, the crossings provided are i) 2 obtuse angle crossings ii) 4 obtuse angle crossings iii) 4 acute angle crossings iv) 6 acute angle crossings The correct answer is (ii) and (iii) (i) and (iii) (i)and(iv) (ii) and (iv) (ii) and (iii) (i) and (iii) (i)and(iv) (ii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The object of providing a point lock is to detect any obstruction between and tongue rail to ensure that the point may not be operated while the train is on it to ensure that each switch is correctly set None of these to detect any obstruction between and tongue rail to ensure that the point may not be operated while the train is on it to ensure that each switch is correctly set None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Will be maximum at the middle of A and B Will be more in the direction of A to B Cannot be determined from the given data Will be more in the direction of B to A Will be maximum at the middle of A and B Will be more in the direction of A to B Cannot be determined from the given data Will be more in the direction of B to A ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Tensile strength of steel used in rails should not be less than 450 MPa 500 MPa 700 MPa 850 MPa 450 MPa 500 MPa 700 MPa 850 MPa ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The nominal size of ballast used for points and crossings is 25 mm 10 mm 40 mm 50 mm 25 mm 10 mm 40 mm 50 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a single line meter gauge track in embankment as adopted on Indian Railways is 5.49 mm 4.88 mm 4.27 mm 4.55 mm 5.49 mm 4.88 mm 4.27 mm 4.55 mm ANSWER DOWNLOAD EXAMIANS APP