Railway Engineering The distance through which the tongue rail moves laterally at the toe of the switch for movement of trains is called throw of the switch heel divergence flangeway clearance None of these throw of the switch heel divergence flangeway clearance None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are (i)and(ii) only (i) (i) and (iii) (ii) and (iii) (i)and(ii) only (i) (i) and (iii) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a railway track depends on thei) type of gaugeii) number of tracks to be laid side by sideiii) slope of sides of embankment or cuttingThe correct answer is only (i) (i), (ii) and (iii) both (i) and (iii) both (i) and (ii) only (i) (i), (ii) and (iii) both (i) and (iii) both (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering To ensure exact gauge, the gauge tie plates are provided at nose of crossing None of these toe of the switch both (A) and (B) nose of crossing None of these toe of the switch both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The treadle bar is provided near and parallel to inner side of both the rails in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of one of the rails at right angle to the rail near and parallel to inner side of both the rails in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of one of the rails at right angle to the rail ANSWER DOWNLOAD EXAMIANS APP