Railway Engineering Heel divergence is Equal to flange-way clearance Always less than flange-way clearance Always greater than flange-way clearance Sometimes greater than flange-way clearance Equal to flange-way clearance Always less than flange-way clearance Always greater than flange-way clearance Sometimes greater than flange-way clearance ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) -0.168 cm 7.432 cm 7.768 cm 0.168 cm -0.168 cm 7.432 cm 7.768 cm 0.168 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements about concrete sleepers. 1. They improve the track modulus. 2. They have good scrap value. 3. They render transportation easy. 4. They maintain the gauge quite satisfactorily. Of these statements 1 and 2 are correct 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct 1 and 2 are correct 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when None of these both arms are horizontal semaphore arm lowered but warner arm horizontal both semaphore and warner arms lowered None of these both arms are horizontal semaphore arm lowered but warner arm horizontal both semaphore and warner arms lowered ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering When the rail ends rest on a joint sleeper, the joint is termed as base joint supported rail joint bridge joint suspended rail joint base joint supported rail joint bridge joint suspended rail joint ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP