Railway Engineering Heel divergence is Always less than flange-way clearance Equal to flange-way clearance Always greater than flange-way clearance Sometimes greater than flange-way clearance Always less than flange-way clearance Equal to flange-way clearance Always greater than flange-way clearance Sometimes greater than flange-way clearance ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Metal sleepers are superior to wooden sleepers with respect to fastening track circuiting life cost fastening track circuiting life cost ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Largest dimension of a rail is its head width height Any of these foot width head width height Any of these foot width ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Minimum composite sleeper index pres-cried on Indian Railways for a track sleeper is 1353 1588 552 783 1353 1588 552 783 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a railway track depends on thei) type of gaugeii) number of tracks to be laid side by sideiii) slope of sides of embankment or cuttingThe correct answer is both (i) and (iii) (i), (ii) and (iii) only (i) both (i) and (ii) both (i) and (iii) (i), (ii) and (iii) only (i) both (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (ii) and (iii) (iii) and (iv) (i) and (ii) (i)and(iv) (ii) and (iii) (iii) and (iv) (i) and (ii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP