Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements I and 2 are correct 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates proceed None of these stop proceed cautiously proceed None of these stop proceed cautiously ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which one of the following rail failures is caused by loose fish bolts at expansion joints? angular break transverse fissures split head crushed head angular break transverse fissures split head crushed head ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following factors govern the choice of the gauge ?i) volume and nature of trafficii) speed of trainiii) physical features of the countryThe correct answer is (i), (ii) and (iii) both (i) and (ii) only (i) both (ii) and (iii) (i), (ii) and (iii) both (i) and (ii) only (i) both (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following mechanical devices is used to ensure that route cannot be changed while the train is on the point even after putting back the signal ? stretcher bar iock bar point lock detectors stretcher bar iock bar point lock detectors ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (i) and (ii) (iii) and (iv) (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) (i)and(iv) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP