Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 1 and 4 are correct 3 and 4 are correct I and 2 are correct 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct I and 2 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a railway track depends on the i) type of gauge ii) number of tracks to be laid side by side iii) slope of sides of embankment or cutting The correct answer is (i), (ii) and (iii) both (i) and (ii) both (i) and (iii) only (i) (i), (ii) and (iii) both (i) and (ii) both (i) and (iii) only (i) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The total gap on both sides between the inside edges of wheel flanges and gauge faces of the rail is kept as 19 mm 16 mm 13 mm 10 mm 19 mm 16 mm 13 mm 10 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ? triangle turntable traverser scotch block triangle turntable traverser scotch block ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a scissors cross-over, the crossings provided arei) 2 obtuse angle crossingsii) 4 obtuse angle crossingsiii) 4 acute angle crossingsiv) 6 acute angle crossingsThe correct answer is (ii) and (iv) (i) and (iii) (i)and(iv) (ii) and (iii) (ii) and (iv) (i) and (iii) (i)and(iv) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates proceed None of these stop proceed cautiously proceed None of these stop proceed cautiously ANSWER DOWNLOAD EXAMIANS APP