Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 2 and 3 are correct 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct I and 2 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a single line meter gauge track in embankment as adopted on Indian Railways is 4.88 mm 4.55 mm 5.49 mm 4.27 mm 4.88 mm 4.55 mm 5.49 mm 4.27 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following mechanical devices is used to ensure that route cannot be changed while the train is on the point even after putting back the signal ? iock bar point lock detectors stretcher bar iock bar point lock detectors stretcher bar ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Pandrol clips cannot be used with wooden sleepers CST-9 sleepers steel trough sleepers concrete sleepers wooden sleepers CST-9 sleepers steel trough sleepers concrete sleepers ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally maximum cant permissible in Meter Gauge is 140 mm 90 mm 75 mm 165 mm 140 mm 90 mm 75 mm 165 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Cant deficiency occurs when a vehicle travels around a curve at Booked speed Equilibrium speed Speeds lower than equilibrium speed Speeds higher than equilibrium speed Booked speed Equilibrium speed Speeds lower than equilibrium speed Speeds higher than equilibrium speed ANSWER DOWNLOAD EXAMIANS APP