Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 16 12 8 4 16 12 8 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a sleeper density of (n+5), the number of sleepers required for constructing a broad gauge railway track of length 650 m is 900 975 963 985 900 975 963 985 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Anti creep bearing plates are provided on None of these bridges and approaches both (A) and (B) joints None of these bridges and approaches both (A) and (B) joints ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 7.432 cm -0.168 cm 0.168 cm 7.768 cm 7.432 cm -0.168 cm 0.168 cm 7.768 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering 60 R rails are mostly used in Broad Gauge None of these Metre Gauge Narrow Gauge Broad Gauge None of these Metre Gauge Narrow Gauge ANSWER DOWNLOAD EXAMIANS APP