Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 3 and 4 are correct I and 2 are correct 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct I and 2 are correct 2 and 3 are correct 1 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The treadle bar is provided in the middle of the track a little in front of the toes of the tongue rail at right angle to the rail near and parallel to inner side of one of the rails near and parallel to inner side of both the rails in the middle of the track a little in front of the toes of the tongue rail at right angle to the rail near and parallel to inner side of one of the rails near and parallel to inner side of both the rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The limiting value of cant deficiency for Meter Gauge routes is 100 mm 75 mm 50 mm 40 mm 100 mm 75 mm 50 mm 40 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Due to battering action of wheels over the end of the rails, the rails get bent down and are deflected at ends. These rails are called Roaring rails Buckled rails Hogged rails Corrugated rails Roaring rails Buckled rails Hogged rails Corrugated rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 8 16 12 4 8 16 12 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a double line Broad Gauge track in cutting (excluding drains) as adopted on Indian Railways is 10.21m 8.84 m 6.10 m 10.82 m 10.21m 8.84 m 6.10 m 10.82 m ANSWER DOWNLOAD EXAMIANS APP