Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 3 and 4 are correct 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct I and 2 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The width of foot for 90 R rail section is 146.0 mm 136.5 mm 122.2 mm 100 mm 146.0 mm 136.5 mm 122.2 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering What will be the curve lead for a 1 in 8.5 turnout taking off from a straight broad gauge track? 7.45 m 28.49 m 21.04 m 14.24 m 7.45 m 28.49 m 21.04 m 14.24 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The object of providing a point lock is to ensure that each switch is correctly set to detect any obstruction between and tongue rail to ensure that the point may not be operated while the train is on it None of these to ensure that each switch is correctly set to detect any obstruction between and tongue rail to ensure that the point may not be operated while the train is on it None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For developing thinly populated areas, the correct choice of gauge is Narrow Gaugev Broad Gauge Any of these Meter Gauge Narrow Gaugev Broad Gauge Any of these Meter Gauge ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Yellow lighthand signal indicates proceed None of these proceed cautiously stop proceed None of these proceed cautiously stop ANSWER DOWNLOAD EXAMIANS APP