Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 1 and 4 are correct 2 and 3 are correct 3 and 4 are correct I and 2 are correct 1 and 4 are correct 2 and 3 are correct 3 and 4 are correct I and 2 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering At points and crossings, the total number of sleepers for 1 in 12 turnouts in Broad Gauge is 70 73 71 72 70 73 71 72 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering To ensure exact gauge, the gauge tie plates are provided at None of these both (A) and (B) nose of crossing toe of the switch None of these both (A) and (B) nose of crossing toe of the switch ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Yellow lighthand signal indicates None of these proceed cautiously stop proceed None of these proceed cautiously stop proceed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of switches provided on a Gaunt-letted track is None of these 3 2 1 None of these 3 2 1 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a single line meter gauge track in embankment as adopted on Indian Railways is 4.88 mm 4.55 mm 5.49 mm 4.27 mm 4.88 mm 4.55 mm 5.49 mm 4.27 mm ANSWER DOWNLOAD EXAMIANS APP