Railway Engineering Consider the following statements about concrete sleepers.1. They improve the track modulus.2. They have good scrap value.3. They render transportation easy.4. They maintain the gauge quite satisfactorily of these statements 1 and 4 are correct 1 and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct 1 and 2 are correct 2 and 3 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Head width of 52 kg rail section is 67 mm 66.7 mm 61.9 mm 72.33 mm 67 mm 66.7 mm 61.9 mm 72.33 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of cotters used in CST-9 sleepers is 3 5 2 4 3 5 2 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A triangle is used for Transferring wagons to and from parallel tracks without shunting Changing the direction of engine Preventing the vehicles from running off the track Separating all the sidings and shunting lines from main lines Transferring wagons to and from parallel tracks without shunting Changing the direction of engine Preventing the vehicles from running off the track Separating all the sidings and shunting lines from main lines ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The sleepers resting directly on girder are fastened to the top flange of girder by fang bolts dog spikes hook bolts rail screws fang bolts dog spikes hook bolts rail screws ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The load on each axle of a locomotive is 22 tonnes. If the coefficient of friction is 0.2, then the hauling capacity due to 3 pairs of driving wheels will be 6.61 13.21 26.41 19.81 6.61 13.21 26.41 19.81 ANSWER DOWNLOAD EXAMIANS APP