Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are only (i) (ii) and (iii) (i) and (iii) (i)and(ii) only (i) (ii) and (iii) (i) and (iii) (i)and(ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Wear of rails is maximum in weight of coastal area tunnels sharp curve tangent track coastal area tunnels sharp curve tangent track ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Lead of crossing is the distance from the toe of the switch to the actual nose of crossing heel of the switch to the toe of the switch toe of the switch to the theoretical nose of crossing heel of the switch to the theoretical nose of the crossing toe of the switch to the actual nose of crossing heel of the switch to the toe of the switch toe of the switch to the theoretical nose of crossing heel of the switch to the theoretical nose of the crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the rail for 52 kg rail section is 162 mm 189 mm 156 mm 187 mm 162 mm 189 mm 156 mm 187 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The shape of transition curve used by Indian Railways is sine curve cubic parabola lemniscate of Bernoulli spiral sine curve cubic parabola lemniscate of Bernoulli spiral ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Anti creep bearing plates are provided on joints bridges and approaches both (A) and (B) None of these joints bridges and approaches both (A) and (B) None of these ANSWER DOWNLOAD EXAMIANS APP