Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are (ii) and (iii) (i)and(ii) only (i) (i) and (iii) (ii) and (iii) (i)and(ii) only (i) (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Minimum composite sleeper index pres-cried on Indian Railways for a track sleeper is 1588 783 552 1353 1588 783 552 1353 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following types of sleepers is preferred on joints ? wooden sleeper concrete sleeper steel trough sleeper CST-9 sleeper wooden sleeper concrete sleeper steel trough sleeper CST-9 sleeper ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A triangle is used for Separating all the sidings and shunting lines from main lines Preventing the vehicles from running off the track Transferring wagons to and from parallel tracks without shunting Changing the direction of engine Separating all the sidings and shunting lines from main lines Preventing the vehicles from running off the track Transferring wagons to and from parallel tracks without shunting Changing the direction of engine ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The load on each axle of a locomotive is 22 tonnes. If the coefficient of friction is 0.2, then the hauling capacity due to 3 pairs of driving wheels will be 6.61 13.21 26.41 19.81 6.61 13.21 26.41 19.81 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements 2 and 3 are correct I and 2 are correct 3 and 4 are correct 1 and 4 are correct 2 and 3 are correct I and 2 are correct 3 and 4 are correct 1 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP