Railway Engineering In a scissors cross-over, the crossings provided arei) 2 obtuse angle crossingsii) 4 obtuse angle crossingsiii) 4 acute angle crossingsiv) 6 acute angle crossingsThe correct answer is (ii) and (iv) (i) and (iii) (ii) and (iii) (i)and(iv) (ii) and (iv) (i) and (iii) (ii) and (iii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Wear of rails is maximum in weight of coastal area tangent track sharp curve tunnels coastal area tangent track sharp curve tunnels ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Will be more in the direction of B to A Cannot be determined from the given data Will be maximum at the middle of A and B Will be more in the direction of A to B Will be more in the direction of B to A Cannot be determined from the given data Will be maximum at the middle of A and B Will be more in the direction of A to B ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following methods of designation of crossing is mostly used in India ? isosceles angle method right angle method None of these center line method isosceles angle method right angle method None of these center line method ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The standard length of rail for Broad Gauge and Meter Gauge are respectively 12 m and 12 m 13 m and 13 m 12 m and 13 m 13 m and 12 m 12 m and 12 m 13 m and 13 m 12 m and 13 m 13 m and 12 m ANSWER DOWNLOAD EXAMIANS APP