Railway Engineering In a scissors cross-over, the crossings provided arei) 2 obtuse angle crossingsii) 4 obtuse angle crossingsiii) 4 acute angle crossingsiv) 6 acute angle crossingsThe correct answer is (i)and(iv) (i) and (iii) (ii) and (iii) (ii) and (iv) (i)and(iv) (i) and (iii) (ii) and (iii) (ii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (iii) and (iv) (i) and (ii) (ii) and (iii) (i)and(iv) (iii) and (iv) (i) and (ii) (ii) and (iii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering One degree of curve is equivalent to (where R is the radius of curve in meters.) 1700/R 1750/R 1600/R 1850/R 1700/R 1750/R 1600/R 1850/R ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when both arms are horizontal None of these both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal both arms are horizontal None of these both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally maximum cant permissible in Meter Gauge is 90 mm 140 mm 165 mm 75 mm 90 mm 140 mm 165 mm 75 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (iii) and (iv) (ii) and (iii) (i) and (ii) (i)and(iv) (iii) and (iv) (ii) and (iii) (i) and (ii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP