Railway Engineering In a scissors cross-over, the crossings provided arei) 2 obtuse angle crossingsii) 4 obtuse angle crossingsiii) 4 acute angle crossingsiv) 6 acute angle crossingsThe correct answer is (ii) and (iv) (ii) and (iii) (i)and(iv) (i) and (iii) (ii) and (iv) (ii) and (iii) (i)and(iv) (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The standard length of rail for Broad Gauge and Meter Gauge are respectively 12 m and 13 m 13 m and 12 m 13 m and 13 m 12 m and 12 m 12 m and 13 m 13 m and 12 m 13 m and 13 m 12 m and 12 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering 52 kg rails are mostly used in both (a) and (b) Narrow Gauge Meter Gauge Broad Gauge both (a) and (b) Narrow Gauge Meter Gauge Broad Gauge ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The distance through which the tongue rail moves laterally at the toe of the switch for movement of trains is called None of these throw of the switch heel divergence flangeway clearance None of these throw of the switch heel divergence flangeway clearance ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Creep is the Lateral movement of rail Longitudinal movement of rail Difference in level of two rails Vertical movement of rail Lateral movement of rail Longitudinal movement of rail Difference in level of two rails Vertical movement of rail ANSWER DOWNLOAD EXAMIANS APP