Railway Engineering In a scissors cross-over, the crossings provided arei) 2 obtuse angle crossingsii) 4 obtuse angle crossingsiii) 4 acute angle crossingsiv) 6 acute angle crossingsThe correct answer is (i) and (iii) (ii) and (iv) (ii) and (iii) (i)and(iv) (i) and (iii) (ii) and (iv) (ii) and (iii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct I and 2 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The side slope of embankments for a railway track is generally taken as 1.5:1 1:1 2:1 1:2 1.5:1 1:1 2:1 1:2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 7.432 cm 7.768 cm -0.168 cm 0.168 cm 7.432 cm 7.768 cm -0.168 cm 0.168 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering What will be the curve lead for a 1 in 8.5 turnout taking off from a straight broad gauge track? 28.49 m 21.04 m 14.24 m 7.45 m 28.49 m 21.04 m 14.24 m 7.45 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The limiting value of cant deficiency for Meter Gauge routes is 40 mm 50 mm 100 mm 75 mm 40 mm 50 mm 100 mm 75 mm ANSWER DOWNLOAD EXAMIANS APP