Railway Engineering Number of cotters used in CST-9 sleepers is 5 3 2 4 5 3 2 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Minimum composite sleeper index pres-cried on Indian Railways for a track sleeper is 552 783 1588 1353 552 783 1588 1353 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Dog spikes are used for fixing rail to the CST-9 sleepers wooden sleepers steel trough sleepers concrete sleepers CST-9 sleepers wooden sleepers steel trough sleepers concrete sleepers ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Lead of crossing is the distance from the toe of the switch to the actual nose of crossing heel of the switch to the toe of the switch heel of the switch to the theoretical nose of the crossing toe of the switch to the theoretical nose of crossing toe of the switch to the actual nose of crossing heel of the switch to the toe of the switch heel of the switch to the theoretical nose of the crossing toe of the switch to the theoretical nose of crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates proceed stop None of these proceed cautiously proceed stop None of these proceed cautiously ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Metal sleepers are superior to wooden sleepers with respect to track circuiting fastening life cost track circuiting fastening life cost ANSWER DOWNLOAD EXAMIANS APP