Railway Engineering Number of cotters used in CST-9 sleepers is 2 3 5 4 2 3 5 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Loose jaws of steel trough sleepers are made of spring steel mild steel cast steel cast iron spring steel mild steel cast steel cast iron ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Yellow lighthand signal indicates proceed cautiously stop None of these proceed proceed cautiously stop None of these proceed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 2-8-2 locomotive with 22.5 tonnes and on each driving axle. Assuming the coefficient of rail-wheel friction to be 0.25, what would be the hauling capacity of the locomotive? 90.0 tonnes 45.0 tonnes 15.0 tonnes 22.5 tonnes 90.0 tonnes 45.0 tonnes 15.0 tonnes 22.5 tonnes ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 20 mm/sec 55 mm/sec 65 mm/sec 35 mm/sec 20 mm/sec 55 mm/sec 65 mm/sec 35 mm/sec ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i) and (ii) (i)and(iv) (ii) and (iii) (iii) and (iv) (i) and (ii) (i)and(iv) (ii) and (iii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP