Railway Engineering Number of cotters used in CST-9 sleepers is 3 2 4 5 3 2 4 5 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Largest percentage of material in the rail is in its head foot head and foot both web head foot head and foot both web ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Yellow lighthand signal indicates proceed cautiously proceed stop None of these proceed cautiously proceed stop None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a scissors cross-over, the crossings provided are i) 2 obtuse angle crossings ii) 4 obtuse angle crossings iii) 4 acute angle crossings iv) 6 acute angle crossings The correct answer is (i)and(iv) (ii) and (iii) (ii) and (iv) (i) and (iii) (i)and(iv) (ii) and (iii) (ii) and (iv) (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Metal sleepers are superior to wooden sleepers with respect to track circuiting fastening life cost track circuiting fastening life cost ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The side slope of embankments for a railway track is generally taken as 1:2 2:1 1.5:1 1:1 1:2 2:1 1.5:1 1:1 ANSWER DOWNLOAD EXAMIANS APP