Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (ii) and (iii) (iii) and (iv) (i) and (ii) (i)and(iv) (ii) and (iii) (iii) and (iv) (i) and (ii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following mechanical devices is used to ensure that route cannot be changed while the train is on the point even after putting back the signal ? point lock stretcher bar detectors iock bar point lock stretcher bar detectors iock bar ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a Broad Gauge route with M+7 sleeper density, number of sleepers per rail length is 20 19 21 18 20 19 21 18 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Loose jaws of steel trough sleepers are made of cast iron spring steel cast steel mild steel cast iron spring steel cast steel mild steel ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The maximum degree of curvature for Meter Gauge is limited to 10° 30° 40° 16° 10° 30° 40° 16° ANSWER DOWNLOAD EXAMIANS APP