Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a single line meter gauge track in embankment as adopted on Indian Railways is 4.88 mm 4.55 mm 5.49 mm 4.27 mm 4.88 mm 4.55 mm 5.49 mm 4.27 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of switches provided on a Gaunt-letted track is None of these 1 3 2 None of these 1 3 2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Yellow lighthand signal indicates None of these proceed cautiously stop proceed None of these proceed cautiously stop proceed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The purpose of providing fillet in a rail section is to Reduce the wear Increase the vertical stiffness Increase the lateral strength Avoid the stress concentration Reduce the wear Increase the vertical stiffness Increase the lateral strength Avoid the stress concentration ANSWER DOWNLOAD EXAMIANS APP