Railway Engineering Lead of crossing is the distance from the heel of the switch to the toe of the switch heel of the switch to the theoretical nose of the crossing toe of the switch to the theoretical nose of crossing toe of the switch to the actual nose of crossing heel of the switch to the toe of the switch heel of the switch to the theoretical nose of the crossing toe of the switch to the theoretical nose of crossing toe of the switch to the actual nose of crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements I and 2 are correct 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct I and 2 are correct 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The object of providing a point lock is None of these to ensure that each switch is correctly set to ensure that the point may not be operated while the train is on it to detect any obstruction between and tongue rail None of these to ensure that each switch is correctly set to ensure that the point may not be operated while the train is on it to detect any obstruction between and tongue rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering One degree of curve is equivalent to (where R is the radius of curve in meters.) 1700/R 1750/R 1850/R 1600/R 1700/R 1750/R 1850/R 1600/R ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following turnouts is most commonly used for goods train on Indian Railways ? 1 in 16 1 in 8’/2 1 in 12 1 in 20 1 in 16 1 in 8’/2 1 in 12 1 in 20 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Pandrol clips cannot be used with wooden sleepers CST-9 sleepers concrete sleepers steel trough sleepers wooden sleepers CST-9 sleepers concrete sleepers steel trough sleepers ANSWER DOWNLOAD EXAMIANS APP