Railway Engineering Lead of crossing is the distance from the toe of the switch to the theoretical nose of crossing heel of the switch to the toe of the switch heel of the switch to the theoretical nose of the crossing toe of the switch to the actual nose of crossing toe of the switch to the theoretical nose of crossing heel of the switch to the toe of the switch heel of the switch to the theoretical nose of the crossing toe of the switch to the actual nose of crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering 60 R rails are mostly used in None of these Broad Gauge Metre Gauge Narrow Gauge None of these Broad Gauge Metre Gauge Narrow Gauge ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Fish plate is in contact with rail at fishing plane web of rail head of rail foot of rail fishing plane web of rail head of rail foot of rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The limiting value of cant deficiency for Meter Gauge routes is 40 mm 100 mm 75 mm 50 mm 40 mm 100 mm 75 mm 50 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following methods of designation of crossing is mostly used in India ? None of these right angle method center line method isosceles angle method None of these right angle method center line method isosceles angle method ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a railway track depends on the i) type of gauge ii) number of tracks to be laid side by side iii) slope of sides of embankment or cutting The correct answer is both (i) and (ii) (i), (ii) and (iii) only (i) both (i) and (iii) both (i) and (ii) (i), (ii) and (iii) only (i) both (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP