Railway Engineering Lead of crossing is the distance from the heel of the switch to the toe of the switch toe of the switch to the actual nose of crossing toe of the switch to the theoretical nose of crossing heel of the switch to the theoretical nose of the crossing heel of the switch to the toe of the switch toe of the switch to the actual nose of crossing toe of the switch to the theoretical nose of crossing heel of the switch to the theoretical nose of the crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Pandrol clips cannot be used with concrete sleepers wooden sleepers steel trough sleepers CST-9 sleepers concrete sleepers wooden sleepers steel trough sleepers CST-9 sleepers ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Staggered joints are generally provided When two different rail sections are required to be joined On straight track None of these On curves When two different rail sections are required to be joined On straight track None of these On curves ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The shape of transition curve used by Indian Railways is sine curve spiral lemniscate of Bernoulli cubic parabola sine curve spiral lemniscate of Bernoulli cubic parabola ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP