Railway Engineering Number offish bolts per fish plate is 6 4 2 5 6 4 2 5 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a railway track depends on the i) type of gauge ii) number of tracks to be laid side by side iii) slope of sides of embankment or cutting The correct answer is only (i) (i), (ii) and (iii) both (i) and (ii) both (i) and (iii) only (i) (i), (ii) and (iii) both (i) and (ii) both (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A treadle bar is used for interlocking points and signal setting points and crossings setting marshalling yard signals track maintenance interlocking points and signal setting points and crossings setting marshalling yard signals track maintenance ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The correct relation between curve lead (CL), switch lead (SL) and lead of cros¬sing (L) is given by L =CL-SL SL = L + CL CL = L – SL L = (CL+SL)/2 L =CL-SL SL = L + CL CL = L – SL L = (CL+SL)/2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Loose jaws of steel trough sleepers are made of cast steel mild steel spring steel cast iron cast steel mild steel spring steel cast iron ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP