Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 4 12 16 8 4 12 16 8 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Flat mild steel bearing plates are used For points and crossings in the lead portion With wooden sleepers at locations where creep is likely to be developed On all the above On all joints and curves For points and crossings in the lead portion With wooden sleepers at locations where creep is likely to be developed On all the above On all joints and curves ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Standard size of wooden sleeper for Broad Gauge track is 225x23x13 cm 275x25x13 cm 180x20x11.5 cm 250x26x12 cm 225x23x13 cm 275x25x13 cm 180x20x11.5 cm 250x26x12 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A triangle is used for Transferring wagons to and from parallel tracks without shunting Separating all the sidings and shunting lines from main lines Changing the direction of engine Preventing the vehicles from running off the track Transferring wagons to and from parallel tracks without shunting Separating all the sidings and shunting lines from main lines Changing the direction of engine Preventing the vehicles from running off the track ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the center of arm of a semaphore signal above the ground is 8.5m 5.5m 6.5 m 7.5 m 8.5m 5.5m 6.5 m 7.5 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i) and (ii) (i)and(iv) (iii) and (iv) (ii) and (iii) (i) and (ii) (i)and(iv) (iii) and (iv) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP