Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 4 12 8 16 4 12 8 16 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The nominal size of ballast used for points and crossings is 50 mm 10 mm 25 mm 40 mm 50 mm 10 mm 25 mm 40 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Due to battering action of wheels over the end of the rails, the rails get bent down and are deflected at ends. These rails are called Corrugated rails Buckled rails Roaring rails Hogged rails Corrugated rails Buckled rails Roaring rails Hogged rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number offish bolts per fish plate is 4 6 5 2 4 6 5 2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 35 mm/sec 20 mm/sec 65 mm/sec 55 mm/sec 35 mm/sec 20 mm/sec 65 mm/sec 55 mm/sec ANSWER DOWNLOAD EXAMIANS APP