Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 8 12 4 16 8 12 4 16 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The sleepers resting directly on girder are fastened to the top flange of girder by dog spikes rail screws fang bolts hook bolts dog spikes rail screws fang bolts hook bolts ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Flange-way clearance is the distance None of these Between the adjoining faces of the running rail and the check rail near the crossing Between the gauge faces of the stock rail and the tongue rail Through which the tongue rail moves laterally at the toe of the switch None of these Between the adjoining faces of the running rail and the check rail near the crossing Between the gauge faces of the stock rail and the tongue rail Through which the tongue rail moves laterally at the toe of the switch ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The steepest gradient permissible on a 2.5° curve for Broad Gauge line having ruling gradient of 1 in 200 is 1 in 250 1 in 222 1 in 275 1 in 235 1 in 250 1 in 222 1 in 275 1 in 235 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The treadle bar is provided near and parallel to inner side of both the rails near and parallel to inner side of one of the rails in the middle of the track a little in front of the toes of the tongue rail at right angle to the rail near and parallel to inner side of both the rails near and parallel to inner side of one of the rails in the middle of the track a little in front of the toes of the tongue rail at right angle to the rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For the purpose of track maintenance, the number of turn out equivalent to one track km are 2 10 5 1 2 10 5 1 ANSWER DOWNLOAD EXAMIANS APP