Railway Engineering For a Broad Gauge route with M+7 sleeper density, number of sleepers per rail length is 21 19 18 20 21 19 18 20 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering At points and crossings, the total number of sleepers for 1 in 12 turnouts in Broad Gauge is 72 71 73 70 72 71 73 70 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a railway track depends on the i) type of gauge ii) number of tracks to be laid side by side iii) slope of sides of embankment or cutting The correct answer is both (i) and (ii) both (i) and (iii) only (i) (i), (ii) and (iii) both (i) and (ii) both (i) and (iii) only (i) (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i)and(iv) (iii) and (iv) (ii) and (iii) (i) and (ii) (i)and(iv) (iii) and (iv) (ii) and (iii) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following types of sleepers is preferred on joints ? concrete sleeper steel trough sleeper wooden sleeper CST-9 sleeper concrete sleeper steel trough sleeper wooden sleeper CST-9 sleeper ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The shape of transition curve used by Indian Railways is spiral cubic parabola sine curve lemniscate of Bernoulli spiral cubic parabola sine curve lemniscate of Bernoulli ANSWER DOWNLOAD EXAMIANS APP