Railway Engineering Switch angle depends oni) heel divergenceii) length of tongue railiii) flangeway clearanceiv) throw of switch The correct answer is (i)and(iv) (i) and (ii) (ii) and (iii) (iii) and (iv) (i)and(iv) (i) and (ii) (ii) and (iii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a scissors cross-over, the crossings provided arei) 2 obtuse angle crossingsii) 4 obtuse angle crossingsiii) 4 acute angle crossingsiv) 6 acute angle crossingsThe correct answer is (i) and (iii) (ii) and (iii) (ii) and (iv) (i)and(iv) (i) and (iii) (ii) and (iii) (ii) and (iv) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements about concrete sleepers.1. They improve the track modulus.2. They have good scrap value.3. They render transportation easy.4. They maintain the gauge quite satisfactorily of these statements 3 and 4 are correct 1 and 4 are correct 1 and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct 1 and 2 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The main function of a fish plate is To join rails with the sleeper None of these To allow rail to expand and contract freely To join the two rails together To join rails with the sleeper None of these To allow rail to expand and contract freely To join the two rails together ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering 52 kg rails are mostly used in Broad Gauge both (a) and (b) Narrow Gauge Meter Gauge Broad Gauge both (a) and (b) Narrow Gauge Meter Gauge ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP