Railway Engineering Head width of 52 kg rail section is 61.9 mm 72.33 mm 67 mm 66.7 mm 61.9 mm 72.33 mm 67 mm 66.7 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,2,4 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 1,3,4,2 3,1,4,2 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Creep is the Lateral movement of rail Vertical movement of rail Longitudinal movement of rail Difference in level of two rails Lateral movement of rail Vertical movement of rail Longitudinal movement of rail Difference in level of two rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of cotters used in CST-9 sleepers is 3 4 5 2 3 4 5 2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A triangle is used for Preventing the vehicles from running off the track Changing the direction of engine Transferring wagons to and from parallel tracks without shunting Separating all the sidings and shunting lines from main lines Preventing the vehicles from running off the track Changing the direction of engine Transferring wagons to and from parallel tracks without shunting Separating all the sidings and shunting lines from main lines ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Yellow lighthand signal indicates proceed None of these stop proceed cautiously proceed None of these stop proceed cautiously ANSWER DOWNLOAD EXAMIANS APP