Railway Engineering If a is the angle of crossing, then the number of crossings ‘N’ according to right angle method is given by Vi cot(cc/2) Vi cosec(a/2) cot(a) cot(oc/2) Vi cot(cc/2) Vi cosec(a/2) cot(a) cot(oc/2) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering If ‘A’ is the angle formed by two gauge faces, the crossing number will be Arad sec A cot A tan A Arad sec A cot A tan A ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A Broad Gauge branch line takes off as a contrary flexure from a main line If the superelevation required for branch line is 10 mm and cant deficiency is 75 mm, the superelevation to be actually provided on the branch line will be 85 mm 10 mm 15 mm 65 mm 85 mm 10 mm 15 mm 65 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a single line meter gauge track in embankment as adopted on Indian Railways is 4.27 mm 5.49 mm 4.55 mm 4.88 mm 4.27 mm 5.49 mm 4.55 mm 4.88 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally maximum cant permissible in Meter Gauge is 75 mm 90 mm 140 mm 165 mm 75 mm 90 mm 140 mm 165 mm ANSWER DOWNLOAD EXAMIANS APP