Railway Engineering If a is the angle of crossing, then the number of crossings ‘N’ according to right angle method is given by cot(a) Vi cot(cc/2) Vi cosec(a/2) cot(oc/2) cot(a) Vi cot(cc/2) Vi cosec(a/2) cot(oc/2) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The main function of a fish plate is To join rails with the sleeper To join the two rails together To allow rail to expand and contract freely None of these To join rails with the sleeper To join the two rails together To allow rail to expand and contract freely None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The purpose of providing fillet in a rail section is to Increase the vertical stiffness Reduce the wear Increase the lateral strength Avoid the stress concentration Increase the vertical stiffness Reduce the wear Increase the lateral strength Avoid the stress concentration ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering What will be the curve lead for a 1 in 8.5 turnout taking off from a straight broad gauge track? 28.49 m 7.45 m 14.24 m 21.04 m 28.49 m 7.45 m 14.24 m 21.04 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The width of foot for 90 R rail section is 122.2 mm 146.0 mm 100 mm 136.5 mm 122.2 mm 146.0 mm 100 mm 136.5 mm ANSWER DOWNLOAD EXAMIANS APP