Airport Engineering Which of the following is used for servicing and repairs of the aircraft? Terminal building Hanger Holding apron Apron Terminal building Hanger Holding apron Apron ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering From the end of an instrumental runway, the approach surface rises outwards 1 in 20 1 in 40 1 in 50 1 in 30 1 in 20 1 in 40 1 in 50 1 in 30 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering An airport has 4 gates. If the weighted average gate occupancy time is 30 minutes and gate utilization factor is 0.5, then the capacity of the gate will be 4 aircrafts per hour 1 aircraft per hour 2 aircrafts per hour 16 aircrafts per hour 4 aircrafts per hour 1 aircraft per hour 2 aircrafts per hour 16 aircrafts per hour ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The minimum width of clearway is 50 m 100 m 150 m 250 m 50 m 100 m 150 m 250 m ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering For the proposed air port, the survey project provides Grading plan All listed here Master plan Topographic plan Grading plan All listed here Master plan Topographic plan ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The lift off distance is the distance along the centre of the runway between the starting point and End of the runway Point where air craft attains a height of 10.7 m End of stop-way Point where air craft becomes air borne End of the runway Point where air craft attains a height of 10.7 m End of stop-way Point where air craft becomes air borne ANSWER DOWNLOAD EXAMIANS APP