Airport Engineering Which of the following is used for servicing and repairs of the aircraft? Hanger Holding apron Terminal building Apron Hanger Holding apron Terminal building Apron ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering An airport has 4 gates. If the weighted average gate occupancy time is 30 minutes and gate utilization factor is 0.5, then the capacity of the gate will be 2 aircrafts per hour 1 aircraft per hour 4 aircrafts per hour 16 aircrafts per hour 2 aircrafts per hour 1 aircraft per hour 4 aircrafts per hour 16 aircrafts per hour ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering If lift off distance of an craft is 2000 m, the clear way at the end of the runway should not be less than 172.5 m 145 m 162.5 m 152.5 m 172.5 m 145 m 162.5 m 152.5 m ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering For determining the basic runway length, the landing case requires that aircraft should come to a stop within p % of the landing distance. The value of p is 0.75 0.4 0.6 0.5 0.75 0.4 0.6 0.5 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering For the proposed air port, the survey project provides Master plan Topographic plan All listed here Grading plan Master plan Topographic plan All listed here Grading plan ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering In approach areas of runways equipped with instrumental landing facilities any object within 4.5 km distance from runway end shall be considered as an obstruction if its height is more than 51 m 20 m 45 m 30 m 51 m 20 m 45 m 30 m ANSWER DOWNLOAD EXAMIANS APP