Airport Engineering As per ICAO recommendation, minimum width of safety area for instrumental runway should be 78 m 450 m 300 m 150 m 78 m 450 m 300 m 150 m ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Maximum gross takeoff weight of an aircraft is Equal to the empty operating weight plus the payload More than the maximum structural landing weight Less than the maximum structural landing weight Equal to the maximum structural landing weight Equal to the empty operating weight plus the payload More than the maximum structural landing weight Less than the maximum structural landing weight Equal to the maximum structural landing weight ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Consider the following statements regarding ICAO recommendation for correction to basic runway length of these statements1. The basic runway length should be increased at the rate of 7 percent per 300 m rise in elevation above the mean sea level.2. The basic runway length after having been corrected for elevation should be further increased at the rate of 1 percent for every 1°C rise in airport reference temperature above the standard atmospheric temperature at that elevation.3. The runway length after having been corrected for elevation and temperature should be further increased at the rate of 20% for every 1 percent of effective gradient. 1 and 2 are correct 1 and 3 are correct 2 and 3 are correct 1, 2 and 3 are correct 1 and 2 are correct 1 and 3 are correct 2 and 3 are correct 1, 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The landing and takeoff of the air craft is made against the direction of wind. In no case the centre line of the runway should make an angle with the wind direction exceeding 10° 30° 20° 40° 10° 30° 20° 40° ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Airport elevation is the reduced level above M.S.L. of Control tower Lowest point of the landing area None of these Highest point of the landing area Control tower Lowest point of the landing area None of these Highest point of the landing area ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Assertion A : The ratio of arriving and departing aircrafts influences the airport capacity: Reason R : Landing operation is generally given priority over the taking off operation. Select your answer based on the coding system given below: Both A and R is true and R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is true but R is false A is false but R is true Both A and R is true and R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is true but R is false A is false but R is true ANSWER DOWNLOAD EXAMIANS APP