Airport Engineering As per UK design criteria, if LCN of aircraft is between 1.25 to 1.5 times the LCN of pavement, then the number of movements allowed are 3000 300 Unrestricted Zero 3000 300 Unrestricted Zero ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering If lift off distance of an craft is 2000 m, the clear way at the end of the runway should not be less than 172.5 m 162.5 m 145 m 152.5 m 172.5 m 162.5 m 145 m 152.5 m ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering In Instrumental landing system, the middle markers are located About 1 km. ahead of the runway threshold At the runway threshold About 7 km. ahead of the runway threshold Along the extended centre line of runway end About 1 km. ahead of the runway threshold At the runway threshold About 7 km. ahead of the runway threshold Along the extended centre line of runway end ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Beaufort scale is used to determine Strength of winds Direction of winds None of these Height of air-crafts Strength of winds Direction of winds None of these Height of air-crafts ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering According to I.C.A.O. all markings on the runways are painted white and on taxiways Black Yellow Red Green Black Yellow Red Green ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Assertion A : Airport capacity during IFR conditions is usually less than that during VFR conditions.Reason R: During clear weather condition (VFR), the aircrafts on final approach to runway can be spaced closer during poor visibility conditions.Select your answer based on the coding system given below: Both A and R is true but R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is false but R is true A is true but R is false Both A and R is true but R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is false but R is true A is true but R is false ANSWER DOWNLOAD EXAMIANS APP