Airport Engineering Which of the following is an example of failure in flexible pavements? Mud pumping Shrinkage cracks Warping cracks Alligator cracking Mud pumping Shrinkage cracks Warping cracks Alligator cracking ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering According to I.C.A.O. the recommended length of air ports is decided on All listed here Effective gradient percentage Standard sea level temperature (15°C) Sea level elevation All listed here Effective gradient percentage Standard sea level temperature (15°C) Sea level elevation ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering International Civil Aviation Organization (I.C.A.O.) was set up at Montreal (Canada), in 1947 1929 1950 1939 1947 1929 1950 1939 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Which of the following factors are taken into account for estimating the runway length required for aircraft landing?1. Normal maximum temperature2. Airport elevation3. Maximum landing weight4. Effective runway gradientSelect the correct answer using the codes given below Codes: 1,3, and 4 1,2 and 4 1,2,3 and 4 2 and 3 1,3, and 4 1,2 and 4 1,2,3 and 4 2 and 3 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Which of the following is used for servicing and repairs of the aircraft? Hanger Holding apron Terminal building Apron Hanger Holding apron Terminal building Apron ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Runway threshold is indicated by a series of parallel lines starting from a distance of 6 m from runway end 3 m from runway end 10 m from runway end 15 m from runway end 6 m from runway end 3 m from runway end 10 m from runway end 15 m from runway end ANSWER DOWNLOAD EXAMIANS APP