Airport Engineering
The slope of the obstruction clearance line from the boundary of the heliport should be

0.069444444444444
0.047222222222222
0.045138888888889
0.043055555555556

ANSWER DOWNLOAD EXAMIANS APP

Airport Engineering
Assertion A : The ratio of arriving and departing aircrafts influences the airport capacity:Reason R : Landing operation is generally given priority over the taking off operation.Select your answer based on the coding system given below:

A is true but R is false
A is false but R is true
Both A and R is true and R is not the correct explanation of A
Both A and R is true and R is the correct explanation of A

ANSWER DOWNLOAD EXAMIANS APP