• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Airport Engineering

Airport Engineering
For the proposed air port, the survey project provides

Master plan
All listed here
Topographic plan
Grading plan

ANSWER DOWNLOAD EXAMIANS APP

Airport Engineering
The slope of the transitional surface for A, B and C type of runway shall be

0.046527777777778
0.048611111111111
0.045138888888889
0.05

ANSWER DOWNLOAD EXAMIANS APP

Airport Engineering
From the end of an instrumental runway, the approach surface rises outwards

1 in 30
1 in 50
1 in 20
1 in 40

ANSWER DOWNLOAD EXAMIANS APP

Airport Engineering
According to I.C.A.O. the recommended length of air ports is decided on

Effective gradient percentage
Standard sea level temperature (15°C)
All listed here
Sea level elevation

ANSWER DOWNLOAD EXAMIANS APP

Airport Engineering
In an airport, if 4 groups of 5 gates each located well separated are considered for traffic and the future to present traffic ratio is 3, then the total requirement of future gates will be

36
68
32
44

ANSWER DOWNLOAD EXAMIANS APP

Airport Engineering
Calm period is the percentage of time during which wind intensity is less than

9.6 kmph
6.4 kmph
4.8 kmph
8.0 kmph

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Airport Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑