Airport Engineering The bearing of the longest line of a wind rose is S 45° E, the bearing of the runway will be numbered 135° 13 Both (C) and (D) 31 135° 13 Both (C) and (D) 31 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering An airport has 4 gates. If the weighted average gate occupancy time is 30 minutes and gate utilization factor is 0.5, then the capacity of the gate will be 16 aircrafts per hour 2 aircrafts per hour 1 aircraft per hour 4 aircrafts per hour 16 aircrafts per hour 2 aircrafts per hour 1 aircraft per hour 4 aircrafts per hour ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The length of a runway under standard atmospheric conditions is 1800 m. If the actual reduced level of the site is 1200 m, the design length of the runway is 2560 m 2360 m 2460 m 2660 m 2560 m 2360 m 2460 m 2660 m ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The depressions and undulations in the pavement, are caused due to Impact of heavy wheel loads Improper compaction of sub-grade Punching effect All listed here Impact of heavy wheel loads Improper compaction of sub-grade Punching effect All listed here ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Pick up the component not applicable to aeroplanes Wings None of these Engines Air screw Wings None of these Engines Air screw ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering For the proposed air port, the survey project provides Topographic plan Master plan Grading plan All listed here Topographic plan Master plan Grading plan All listed here ANSWER DOWNLOAD EXAMIANS APP