Process Equipment and Plant Design Two iron pipes of the same nominal diameter but different schedule numbers will have the same Outside diameter Inside diameter None of these Wall thickness Outside diameter Inside diameter None of these Wall thickness ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Liquid redistribution should be done in a packed tower packed with raschig rings every 6 metres or __________ times the column diameter, whichever is lower. 10-12.5 15-20 2.5-3.0 5-7.5 10-12.5 15-20 2.5-3.0 5-7.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The optimum size ratio for two mixed reactors in series depends on the kinetics of the reaction and the conversion level. For reaction orders more than one, the Equal sized reactors are the best Larger reactor should come first Smaller reactor should come first None of these Equal sized reactors are the best Larger reactor should come first Smaller reactor should come first None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The function of manholes provided in the shell of a distillation column is to All of these Give access to the individual trays for cleaning, maintenance and installation Guard against foaming & entrainment by dumping antifoaming agent through it Keep a check on the liquid gradient over the plate by direct visual observation All of these Give access to the individual trays for cleaning, maintenance and installation Guard against foaming & entrainment by dumping antifoaming agent through it Keep a check on the liquid gradient over the plate by direct visual observation ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Overall mass transfer co-efficient in case of absorption of __________ in water is based on the gas film co-efficient only, as the mass transfer process is gas film (phase) controlling. SO₂ NH₃ None of these CO₂ SO₂ NH₃ None of these CO₂ ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing. 100-150 1000-1500 20-40 43835 100-150 1000-1500 20-40 43835 ANSWER DOWNLOAD EXAMIANS APP