Highway Engineering The most efficient traffic signal system is flexible progressive system simultaneous system simple progressive system alternate system flexible progressive system simultaneous system simple progressive system alternate system ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In hill roads the side drains arc provided only on the opposite side of hill on both sides of road only on the hill side of road None of these only on the opposite side of hill on both sides of road only on the hill side of road None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is considered to be the highest quality construction in the group of black top pavements? Sheet asphalt Bituminous concrete Bituminous carpet Mastic asphalt Sheet asphalt Bituminous concrete Bituminous carpet Mastic asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If an ascending gradient of 1 in 50 meets a descending gradient of 1 in 50, the length of summit curve for a stopping sight distance of 80 m will be 80m 60m 64m zero 80m 60m 64m zero ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering A traffic rotary is justified where space is limited and costly when traffic volume is more than 5000 vehicles per hour when traffic volume is less than 500 vehicles per hour number of intersecting roads is between 4 and 7 space is limited and costly when traffic volume is more than 5000 vehicles per hour when traffic volume is less than 500 vehicles per hour number of intersecting roads is between 4 and 7 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at both 2.5 mm and 5.0 mm penetrations 7.5 mm penetration only 2.5 mm penetration only 5.0 mm penetration only both 2.5 mm and 5.0 mm penetrations 7.5 mm penetration only 2.5 mm penetration only 5.0 mm penetration only ANSWER DOWNLOAD EXAMIANS APP