Process Equipment and Plant Design The minimum shell thickness for tank ≤ 15 metres diameter is limited to __________ mm, for reasons of elastic stability. 2 15 10 5 2 15 10 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In the allocated cap area, bubble caps are generally arranged on equilateral triangular pitch. Number of caps fixed on a plate is with a Cap pitch of 1.3-2 times the cap diameter Either A or B Clearance of 25-75 mm Neither A nor B Cap pitch of 1.3-2 times the cap diameter Either A or B Clearance of 25-75 mm Neither A nor B ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Le/D for fully open gate valves would be Much more than that for fully open globe valves Both B and C Much less (say 2% than that for fully open globe valves) Around 7 Much more than that for fully open globe valves Both B and C Much less (say 2% than that for fully open globe valves) Around 7 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The minimum plate spacing in most of the pertroleum refinery distillation columns (of dia > 3 ft) is normally __________ inches. 34 18 12 6 34 18 12 6 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design It is not desirable to design a heat exchanger for LMTD correction factor, FT, of less than 0.55 0.99 0.95 0.8 0.55 0.99 0.95 0.8 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The LMTD correction factor (FT) is applied in __________ heat exchangers. All multipass Double pipe 1-1 cocurrent All of these All multipass Double pipe 1-1 cocurrent All of these ANSWER DOWNLOAD EXAMIANS APP