for couplings and unions would be

200
Negligible
60
350

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
In the agitators, the power required will be changed with the increase of diameter of agitator (D) as

D
D²
D⁵
D⁹

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
For storing hazardous chemicals in large storage tanks, the minimum safe distance between the two tanks should range between __________ times the tank diameter.

4 to 5
1 to 1.5
6 to 8
2.5 to 3.5

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
An underdesigned steam trap will

Back up condensate and cause water hammer in steam line
Destroy itself of acceleration wear due to rapid recycling
None of these
Waste steam

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
In distillation columns, bubble caps are held in place over trays by

Rivets
A hold down bar
Bolts
Both B and C

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
The clearance between two tubes in a shell and tube heat exchanger is known as 'ligament', whose minimum value is __________ the outside diameter of the tube, but in no case it should be less than 4.5 mm.

One fourth
Half
Equal to
Three fourth

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Process Equipment and Plant Design

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑