Process Equipment and Plant Design for couplings and unions would be 200 Negligible 60 350 200 Negligible 60 350 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In the agitators, the power required will be changed with the increase of diameter of agitator (D) as D D² D⁵ D⁹ D D² D⁵ D⁹ ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For storing hazardous chemicals in large storage tanks, the minimum safe distance between the two tanks should range between __________ times the tank diameter. 4 to 5 1 to 1.5 6 to 8 2.5 to 3.5 4 to 5 1 to 1.5 6 to 8 2.5 to 3.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design An underdesigned steam trap will Back up condensate and cause water hammer in steam line Destroy itself of acceleration wear due to rapid recycling None of these Waste steam Back up condensate and cause water hammer in steam line Destroy itself of acceleration wear due to rapid recycling None of these Waste steam ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In distillation columns, bubble caps are held in place over trays by Rivets A hold down bar Bolts Both B and C Rivets A hold down bar Bolts Both B and C ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The clearance between two tubes in a shell and tube heat exchanger is known as 'ligament', whose minimum value is __________ the outside diameter of the tube, but in no case it should be less than 4.5 mm. One fourth Half Equal to Three fourth One fourth Half Equal to Three fourth ANSWER DOWNLOAD EXAMIANS APP