Process Equipment and Plant Design for couplings and unions would be 350 Negligible 200 60 350 Negligible 200 60 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For storing hazardous chemicals in large storage tanks, the minimum safe distance between the two tanks should range between __________ times the tank diameter. 4 to 5 2.5 to 3.5 1 to 1.5 6 to 8 4 to 5 2.5 to 3.5 1 to 1.5 6 to 8 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For a given design of bubble cap, the number of bubble caps to be used per tray is set by the All of these Allowable gas velocity through the slots Diameter of the column Plate spacing All of these Allowable gas velocity through the slots Diameter of the column Plate spacing ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The average velocity in the tubes of a 1-4 heat exchanger is __________ times that in 1-1 heat exchanger having the same size & number of tubes and operated at same liquid flow rate. 4 43832 43834 2 4 43832 43834 2 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a shell and tube heat exchanger, the clearance of the tube is generally Not less than one-fourth of the tube diameter or 3/16" More in case of triangular pitch as compared to the square pitch tube layout Equal to the tube diameter More than the tube diameter Not less than one-fourth of the tube diameter or 3/16" More in case of triangular pitch as compared to the square pitch tube layout Equal to the tube diameter More than the tube diameter ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Thickness of the frame of a plate and frame filter as compared to that of plates is More Less Either A or B Same More Less Either A or B Same ANSWER DOWNLOAD EXAMIANS APP