Process Equipment and Plant Design for couplings and unions would be 350 200 60 Negligible 350 200 60 Negligible ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Bubble cap plate column is Used only for distillation, not for absorption A continuous contactor A finite stage contactor A differential stage contactor Used only for distillation, not for absorption A continuous contactor A finite stage contactor A differential stage contactor ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Maximum acceptable total liquid gradient over a tray is about __________ mm. 30.5 12.5 45.5 5.5 30.5 12.5 45.5 5.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Optimum economic pipe diameter for fluid flow is determined by the Total cost considerations (pumping cost plus fixed cost of the pipe) Viscosity of the fluid None of these Density of the fluid Total cost considerations (pumping cost plus fixed cost of the pipe) Viscosity of the fluid None of these Density of the fluid ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Ratio of tube length to shell diameter for a shell and tube heat exchanger is 8 : 1 to 12 : 1 for both liquid-liquid and gas-gas heat exchangers < 4 : 1 for gas-gas exchangers Both B & C 4 : 1 to 8 : 1 for liquid-liquid exchanger 8 : 1 to 12 : 1 for both liquid-liquid and gas-gas heat exchangers < 4 : 1 for gas-gas exchangers Both B & C 4 : 1 to 8 : 1 for liquid-liquid exchanger ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The safe distance of habitation from a hazardous chemical plant (TLV of its product < 1000 ppm) should be about __________ kms. 1 15 5 25 1 15 5 25 ANSWER DOWNLOAD EXAMIANS APP