Process Equipment and Plant Design Liquid redistribution should be done in a packed tower packed with raschig rings every 6 metres or __________ times the column diameter, whichever is lower. 5-7.5 10-12.5 2.5-3.0 15-20 5-7.5 10-12.5 2.5-3.0 15-20 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Safety valves are provided in chemical equipments to guard against excessive Temperature Noise Turbulence Pressure/pressure fluctuation Temperature Noise Turbulence Pressure/pressure fluctuation ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a multiple effect evaporator system having 'n' effects, the amount of water evaporated per unit surface area in approximately equal to __________ times that in a single effect. nth 0.5 nth (1/n)th 1.5 nth nth 0.5 nth (1/n)th 1.5 nth ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The distance between the top of the slots and the liquid surface when the static liquid is just ready to flow over the overflow weir is called Static submergence None of these Skirt clearance Downcomer liquid seal Static submergence None of these Skirt clearance Downcomer liquid seal ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Tube wall thickness depends on the cor-rosiveness of the fluids and their operating pressure & temperature and is specified by Birmingham wire gauge (B.W.G)-a number which varies from 8 to 18 with the numbers 14 and 16 being more commonly used. Outside diameter of tubes varies from about 15 to 50 mm; however a tube of less than __________ mm outside diameter is generally not recommended for fouling fluids. 16 28 38 19 16 28 38 19 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Removable connection of tubes to tube sheet is called Socket Saddle Ferrule Nipple Socket Saddle Ferrule Nipple ANSWER DOWNLOAD EXAMIANS APP