Process Equipment and Plant Design Liquid redistribution should be done in a packed tower packed with raschig rings every 6 metres or __________ times the column diameter, whichever is lower. 15-20 2.5-3.0 10-12.5 5-7.5 15-20 2.5-3.0 10-12.5 5-7.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Fouling factor must be included in the calculation of over all design heat transfer coefficient, when the liquid Containing suspended solids flows at low velocity Is highly viscous Containing suspended solids flows at high velocity Is of high specific gravity Containing suspended solids flows at low velocity Is highly viscous Containing suspended solids flows at high velocity Is of high specific gravity ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Baffles may be eliminated for None of these Low viscosity liquids (< 200 poise) High viscosity liquids (> 600 poise) Large diameter tanks None of these Low viscosity liquids (< 200 poise) High viscosity liquids (> 600 poise) Large diameter tanks ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Removable connection of tubes to tube sheet is called Socket Nipple Ferrule Saddle Socket Nipple Ferrule Saddle ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A high vapour velocity is required for high plate efficiency in a seive plate coloumn. The satisfactory value of operating vapor velocity for design purpose in seive plate column is about __________ percent of the flooding velocity. 60 45 80 95 60 45 80 95 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design __________ tower is the most suitable gas-liquid contacting device involving highly corrosive fluids. Packed None of these Bubble cap plate Sieve plate Packed None of these Bubble cap plate Sieve plate ANSWER DOWNLOAD EXAMIANS APP