Process Equipment and Plant Design Liquid redistribution should be done in a packed tower packed with raschig rings every 6 metres or __________ times the column diameter, whichever is lower. 10-12.5 15-20 2.5-3.0 5-7.5 10-12.5 15-20 2.5-3.0 5-7.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Corrosion allowance in the design of pressure vessel/chemical equipment is not necessary, if Wall thickness is > 30 mm Material of construction is high alloy steel Both B & C Plain carbon steel and cast iron parts are used Wall thickness is > 30 mm Material of construction is high alloy steel Both B & C Plain carbon steel and cast iron parts are used ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Two iron pipes of the same nominal diameter but different schedule numbers will have the same Inside diameter None of these Wall thickness Outside diameter Inside diameter None of these Wall thickness Outside diameter ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Bubble cap plate column is A differential stage contactor A continuous contactor A finite stage contactor Used only for distillation, not for absorption A differential stage contactor A continuous contactor A finite stage contactor Used only for distillation, not for absorption ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design If a single tube pass heat exchanger is converted to two passes; for the same flow rate, the pressure drop per unit length in tube side will __________ times. Increase by 21.6 Decrease by 22 Increase by 1.8 None of these Increase by 21.6 Decrease by 22 Increase by 1.8 None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Accidents in chemical plants are mostly due to Faulty operating procedures Improper layout of the equipments Inadequate equipment design Failure of equipments Faulty operating procedures Improper layout of the equipments Inadequate equipment design Failure of equipments ANSWER DOWNLOAD EXAMIANS APP