Process Equipment and Plant Design Liquid redistribution should be done in a packed tower packed with raschig rings every 6 metres or __________ times the column diameter, whichever is lower. 2.5-3.0 10-12.5 15-20 5-7.5 2.5-3.0 10-12.5 15-20 5-7.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A claming section before the liquid flows into the downcomer is privided to Reduce the discharge fluctuation Cool the liquid before it flows down Permit release of entrained vapour in the liquid Ensure better vapour-liquid contact Reduce the discharge fluctuation Cool the liquid before it flows down Permit release of entrained vapour in the liquid Ensure better vapour-liquid contact ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Width and depth of grooves in the tube sheet holes normally are __________ inch respectively. 1/8 and 1/64 1/2 and 8 1/64 and 1/8 1/2 and 5 1/8 and 1/64 1/2 and 8 1/64 and 1/8 1/2 and 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Normal screwed fittings are used for pipes upto a diameter of __________ inches. 1.5 7 3 5 1.5 7 3 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For identical situation, condensing film coefficient in case of a horizontal condenser is almost __________ the value expected in case of vertical condenser. Half Thrice Five times Twice Half Thrice Five times Twice ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Commercial packed scrubbers are normally designed for a pressure drop range of __________ mm water coloumn per metre of packed height. 52-68 88-105 17-34 43929 52-68 88-105 17-34 43929 ANSWER DOWNLOAD EXAMIANS APP