Process Equipment and Plant Design The safe distance of habitation from a hazardous chemical plant (TLV of its product < 1000 ppm) should be about __________ kms. 25 15 1 5 25 15 1 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Wall thickness of schedule 40 pipe as compared to that of schedule 80 pipe is Less More Cither A or B; depends upon the I.D. of the pipe Same Less More Cither A or B; depends upon the I.D. of the pipe Same ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The LMTD correction factor (FT) is applied in __________ heat exchangers. 1-1 cocurrent All multipass Double pipe All of these 1-1 cocurrent All multipass Double pipe All of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A high vapour velocity is required for high plate efficiency in a seive plate coloumn. The satisfactory value of operating vapor velocity for design purpose in seive plate column is about __________ percent of the flooding velocity. 45 95 60 80 45 95 60 80 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The main purpose of providing stepping on the trays is to Facilitate handling of large flow rate of liquid Improve the flow condition Increase the residence time Decrease the pressure drop Facilitate handling of large flow rate of liquid Improve the flow condition Increase the residence time Decrease the pressure drop ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Bubble cap plate column is A continuous contactor Used only for distillation, not for absorption A finite stage contactor A differential stage contactor A continuous contactor Used only for distillation, not for absorption A finite stage contactor A differential stage contactor ANSWER DOWNLOAD EXAMIANS APP