Process Equipment and Plant Design
In the allocated cap area, bubble caps are generally arranged on equilateral triangular pitch. Number of caps fixed on a plate is with a

Neither A nor B
Either A or B
Cap pitch of 1.3-2 times the cap diameter
Clearance of 25-75 mm

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
In the design of a shell and tube heat exchanger, the corrosion allowance

For carbon steel and cast iron pressure parts is 1.5 mm (except for tubes) and for severe conditions it is 3 mm
All of these
Need not be provided for non-pressure parts like tie rods, spacers, baffles, supports etc
For internal cover and tube sheet is provided on both the sides

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
For a cylindrical shell, (subject to the thickness of uppermost course being more than the minimum for diaofthe tank in question), the thickness of the courses of shell

Remains same throughout
Decreases upwards
May decrease or increase upwards depending upon whether vacuum or positive pressure would be maintained inside the shell
Increases upwards

ANSWER DOWNLOAD EXAMIANS APP