Process Equipment and Plant Design In the allocated cap area, bubble caps are generally arranged on equilateral triangular pitch. Number of caps fixed on a plate is with a Clearance of 25-75 mm Neither A nor B Either A or B Cap pitch of 1.3-2 times the cap diameter Clearance of 25-75 mm Neither A nor B Either A or B Cap pitch of 1.3-2 times the cap diameter ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Which of the following efficiencies can be greater than 100%? None of these Murphree plate efficiency Point efficiency Overall plate efficiency None of these Murphree plate efficiency Point efficiency Overall plate efficiency ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pick out the wrong statement about routing of fluids in a shell and tube heat exchanger. The viscous fluid should be routed through the shell side The corrosive and fouling fluid should be preferably routed through the tubes Lower flow rate fluid should be routed through the shell side Higher pressure fluid stream should be routed through the shell side The viscous fluid should be routed through the shell side The corrosive and fouling fluid should be preferably routed through the tubes Lower flow rate fluid should be routed through the shell side Higher pressure fluid stream should be routed through the shell side ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Theoretically calculated diameter of the stripping section of the continuous rectification column is __________ that of the enriching section. Same as Either more or less (depending upon relative volatility) Less than More than Same as Either more or less (depending upon relative volatility) Less than More than ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design __________ head is the most economical for cylindrical vessels designed for operating at high pressure (> 15 atm.). Ellipsoidal Hemispherical Dished Conical Ellipsoidal Hemispherical Dished Conical ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a rotary drier, the average retention time of solid is(where Z = length of the drier, metres ρ = apparent solid density, kg/m³ L = flow rate of dry solids, kg/see. m² drier cross-section H = hold up of solid.) H.ρ/L Z.H/L.ρ Z.H.ρ/L L/Z.H.ρ H.ρ/L Z.H/L.ρ Z.H.ρ/L L/Z.H.ρ ANSWER DOWNLOAD EXAMIANS APP