Process Equipment and Plant Design In the allocated cap area, bubble caps are generally arranged on equilateral triangular pitch. Number of caps fixed on a plate is with a Neither A nor B Cap pitch of 1.3-2 times the cap diameter Either A or B Clearance of 25-75 mm Neither A nor B Cap pitch of 1.3-2 times the cap diameter Either A or B Clearance of 25-75 mm ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A 'rupture disc' is provided in chemical equipments as an accessory meant for Enhancing mixing rate Creating turbulence Relieving excess pressure Avoiding vortex formation Enhancing mixing rate Creating turbulence Relieving excess pressure Avoiding vortex formation ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The safe distance of habitation from a hazardous chemical plant (TLV of its product < 1000 ppm) should be about __________ kms. 1 25 5 15 1 25 5 15 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design An increase in the liquid resistance to interphase mass transfer and a resultant reduction in plate efficiency is caused by Decrease in gas solubility for absorbers An increase in relatived volatility for rectification columns All of these An increase in liquid viscosity Decrease in gas solubility for absorbers An increase in relatived volatility for rectification columns All of these An increase in liquid viscosity ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The ratio of tube length to shell diameter in case of liquid shell and tube heat exchanger ranges from 4 to 8 3 to 5 6 to 12 2 to 3 4 to 8 3 to 5 6 to 12 2 to 3 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Lug support is The most suitable for thick vertical vessel All of these Same as bracket support Provided usually for vessels of much smaller height than skirt supported vessels The most suitable for thick vertical vessel All of these Same as bracket support Provided usually for vessels of much smaller height than skirt supported vessels ANSWER DOWNLOAD EXAMIANS APP