Process Equipment and Plant Design Rivets are generally specified by the Shank diameter Head diameter Overall length None of these Shank diameter Head diameter Overall length None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For given number of passes, pitch & tube diameter, the maximum number of tubes that can be accommodated in a shell of tripled inside diameter will be __________ times. Considerably more than 9 About 9 Considerably less than 9 About 3 Considerably more than 9 About 9 Considerably less than 9 About 3 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Number of evaporators which can be used in service in a multiple effect evaporation system is limited by the Neither A nor B Both A & B Practical limit reached, due to low heat transfer rate because of inadequate temperature difference Economic limit reached, when the plant cost exceeds the saving of steam Neither A nor B Both A & B Practical limit reached, due to low heat transfer rate because of inadequate temperature difference Economic limit reached, when the plant cost exceeds the saving of steam ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The dust collection efficiency of electrostatic precipitator increases with increase in the Neither A nor B Electrode area Both A & B Gas flow rate Neither A nor B Electrode area Both A & B Gas flow rate ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Length to diameter ratio of most rotary driers is in the range of 4 to 10 10 to 20 20 to 30 1 to 2 4 to 10 10 to 20 20 to 30 1 to 2 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The average velocity in the tubes of a 1-4 heat exchanger is __________ times that in 1-1 heat exchanger having the same size & number of tubes and operated at same liquid flow rate. 43834 43832 4 2 43834 43832 4 2 ANSWER DOWNLOAD EXAMIANS APP