Process Equipment and Plant Design Vertical vessels are not supported by Brackets Skirts Columns Saddles Brackets Skirts Columns Saddles ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Le/D for fully open gate valves would be Both B and C Much more than that for fully open globe valves Much less (say 2% than that for fully open globe valves) Around 7 Both B and C Much more than that for fully open globe valves Much less (say 2% than that for fully open globe valves) Around 7 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In the design of a shell and tube heat exchanger, the corrosion allowance For carbon steel and cast iron pressure parts is 1.5 mm (except for tubes) and for severe conditions it is 3 mm All of these For internal cover and tube sheet is provided on both the sides Need not be provided for non-pressure parts like tie rods, spacers, baffles, supports etc For carbon steel and cast iron pressure parts is 1.5 mm (except for tubes) and for severe conditions it is 3 mm All of these For internal cover and tube sheet is provided on both the sides Need not be provided for non-pressure parts like tie rods, spacers, baffles, supports etc ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For pipe flows, head is proportional to __________ at constant capacity (where D = pipe diameter ). 1/D D² 1/D² 1/D⁵ 1/D D² 1/D² 1/D⁵ ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a multipass shell and tube heat exchanger, the problem of differential expansion between the shell and tube passes is taken care of by using a U-bend Floating head tube sheet Neither A nor B Either A or B U-bend Floating head tube sheet Neither A nor B Either A or B ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For storing hazardous chemicals in large storage tanks, the minimum safe distance between the two tanks should range between __________ times the tank diameter. 4 to 5 1 to 1.5 2.5 to 3.5 6 to 8 4 to 5 1 to 1.5 2.5 to 3.5 6 to 8 ANSWER DOWNLOAD EXAMIANS APP