Process Equipment and Plant Design The minimum baffle height should be 3/4 of the tank height Twice the impeller diameter Equal to the impeller diameter Twice the tank diameter 3/4 of the tank height Twice the impeller diameter Equal to the impeller diameter Twice the tank diameter ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design It is not desirable to design a heat exchanger for LMTD correction factor, FT, of less than 0.8 0.95 0.55 0.99 0.8 0.95 0.55 0.99 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In distillation columns, bubble caps are held in place over trays by A hold down bar Both B and C Rivets Bolts A hold down bar Both B and C Rivets Bolts ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The force due to wind load acting on a tall vessel depends upon its All of these Height Outside diameter Shape All of these Height Outside diameter Shape ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For given number of passes, pitch & tube diameter, the maximum number of tubes that can be accommodated in a shell of tripled inside diameter will be __________ times. Considerably less than 9 Considerably more than 9 About 9 About 3 Considerably less than 9 Considerably more than 9 About 9 About 3 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Flanges are connected to pipes by Brazing Screwing All of these Welding Brazing Screwing All of these Welding ANSWER DOWNLOAD EXAMIANS APP