Process Equipment and Plant Design The minimum baffle height should be Twice the tank diameter 3/4 of the tank height Twice the impeller diameter Equal to the impeller diameter Twice the tank diameter 3/4 of the tank height Twice the impeller diameter Equal to the impeller diameter ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Which tube arrangement in a heat exchanger would facilitate highest heat transfer rate? Triangular pitch Square pitch Heat transfer rate is independent of tube arrangement Diagonal square pitch Triangular pitch Square pitch Heat transfer rate is independent of tube arrangement Diagonal square pitch ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In case of saddle packing (e.g., berl and intralox saddles), the maximum size of the packing should not exceed __________ of the column diameter. l/5th l/50th l/15th l/30th l/5th l/50th l/15th l/30th ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Which of the following material is seldom used for pressure vessel construction? Mild steel Rimmed still Killed steel Semi-killed steel Mild steel Rimmed still Killed steel Semi-killed steel ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The LMTD correction factor (FT) is defined as the Ratio of true temperature difference to the LMTD Geometric mean of the true temperature difference and the LMTD Differenced of true temperature difference and the LMTD Ratio of LMTD to the true temperature difference Ratio of true temperature difference to the LMTD Geometric mean of the true temperature difference and the LMTD Differenced of true temperature difference and the LMTD Ratio of LMTD to the true temperature difference ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design With increase in the reflux ratio for a fixed production from a continuous binary distillation column, the __________ decreases. Running cost of cooling water for condenser Fixed charges initially Vapour & liquid load both Running cost of steam for reboiler Running cost of cooling water for condenser Fixed charges initially Vapour & liquid load both Running cost of steam for reboiler ANSWER DOWNLOAD EXAMIANS APP