Process Equipment and Plant Design The ratio for the rate of washing to the final rate of filtration in a washing type of plate and frame filter is 0.75 0.25 1.25 0.5 0.75 0.25 1.25 0.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pick out the wrong statement pertaining to the design of a long tube vertical evaporator. Liquor level is maintained at l/3rd to 1/2 of the height of the tube None of these Steam is fed to the shell, whereas the liquor is filled inside the tube Tube dia is 3-6 cms, while tube length in 3-6 metres Liquor level is maintained at l/3rd to 1/2 of the height of the tube None of these Steam is fed to the shell, whereas the liquor is filled inside the tube Tube dia is 3-6 cms, while tube length in 3-6 metres ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In most of the shell and tube heat exchangers, the tube pitch is generally __________ the tube diameter. Less than 2.5 times 1.25-1.50 times One-fourth of Less than 2.5 times 1.25-1.50 times One-fourth of ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The minimum baffle height should be Twice the impeller diameter 3/4 of the tank height Equal to the impeller diameter Twice the tank diameter Twice the impeller diameter 3/4 of the tank height Equal to the impeller diameter Twice the tank diameter ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Two iron pipes of the same nominal diameter but different schedule numbers will have the same Inside diameter Outside diameter None of these Wall thickness Inside diameter Outside diameter None of these Wall thickness ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pick out the wrong statement about routing of fluids in a shell and tube heat exchanger. Higher pressure fluid stream should be routed through the shell side Lower flow rate fluid should be routed through the shell side The viscous fluid should be routed through the shell side The corrosive and fouling fluid should be preferably routed through the tubes Higher pressure fluid stream should be routed through the shell side Lower flow rate fluid should be routed through the shell side The viscous fluid should be routed through the shell side The corrosive and fouling fluid should be preferably routed through the tubes ANSWER DOWNLOAD EXAMIANS APP